Construction Schedule Analysis

Review schedule evidence and explore bounded resource and recovery scenarios.

Capabilities depend on module, access, source readiness and configured services. TRACE prepares and explains; authorized people approve.

TRACE Intelligence: schedule and resource scenarios 11 entries

Combine deterministic schedule analysis with bounded alternatives for authorized review.

Module and source availability apply
  • Supported schedule imports

    Read CSV, XLSX, MS Project XML and Primavera P6 XER exports through supported parsers.

  • Immutable schedule versions

    Retain source identity, import assumptions and authorized version comparisons.

  • CPM and logic analysis

    Inspect supported critical-path calculations, relationships, gaps and version deltas.

  • Rolling look-ahead

    Prepare three-week look-ahead drafts with constraints, accountable transitions and export.

  • Living Project rehearsal

    Compare up to four user-supplied network alternatives for duration, release and dependency changes.

  • Recovery scenario generation

    Generate four fixed-priority heuristic proposals for eligible complete, unstarted networks of 1-200 activities and up to 1,000 supported relationships.

  • Work-calendar handling

    Evaluate supported work periods, closures and dependencies in the recovery planner.

  • Resource feasibility

    Respect declared labor/equipment capacities and material-release constraints in supported recovery cases.

  • Declared cost comparison

    Show direct work costs based on the supplied rates and inputs, rather than inferred project margin.

  • Unsupported-input refusal

    Inspect original source semantics; refuse unsupported logic, ambiguous defaults, actual-progress recovery and unrepresentable constraints.

  • Reviewable output

    Show assumptions, finish effects and relevant calculation evidence without modifying the imported schedule.

Legacy rehearsal uses abstract elapsed minutes; recovery is a separate constrained planner. Neither guarantees a global optimum, constructability, Monte Carlo probabilities or automatic write-back to P6/MS Project.

Source and availability details ↗

See the workflow with your team.

Use a working session to review the records, responsibilities and configuration your project needs.

Book a demo · Pricing and scope · Security and trust

SEE IT IN TRACE

Open the screen. Follow the work.

See the TRACE workspace behind this capability, with its related navigation expanded and the project record in view.

TRACE Schedule Control screen for Cedar Avenue Park Renewal with the related project navigation expanded
Schedule Control · Baseline versions, schedule updates, CPM checks and rolling look-ahead.Open full-resolution screen ↗

TRACE interface shown with the Cedar Avenue Park Renewal sample project. Menus and capability names match the TRACE workspace. The complete screen scales to the device width.