TRACE / CONNECTED PROJECT WORKFLOWS

Explore the TRACE Platform

Browse documented TRACE tools and workflows, including their availability and release limits.

THE TRACE PLATFORM

Explore what TRACE can do.

Open full guide ↗Download 731-entry register (PDF) ↗

Search 731 documented capabilities across 58 sections, plus the current license options. Available, conditional and development items retain their scope notes.

58 capability sections · 731 documented entries · 34 license options

Project overview

Platform: account, navigation and access 12 entries

An organized workspace for owners, public agencies, construction managers, designers and contractors.

  • Account and profile

    Manage profile, password, organization identity and branding.

  • Project portfolio

    Create and open authorized projects; review active, closeout, archived and permitted trash views.

  • Account overview

    Use portfolio summaries and project selection to reach the right job.

  • Project control center

    Access project tools, current work, updates and available records from one starting point.

  • Task-oriented menu

    Use grouped navigation for home, field work, plans, reviews, schedules, costs and closeout.

  • Find a project tool

    Search navigation labels to locate a supported section quickly.

  • Quick access

    Open common records through account/project shortcuts.

  • Visible authority context

    See customer, project and current authority so actions are taken in the right workspace.

  • Organizations and users

    Assign participating organizations, project team members, roles and effective permissions.

  • Notifications and activity

    Review notifications, assigned actions and AI activity/audit information.

  • Page help and language controls

    Use contextual guidance and available interface language options.

  • Field application controls

    Configure licensed project, organization and person-level access; device enrollment and operating-system permissions remain separate.

Scope and availability: Module visibility depends on licensing and effective permissions. Device access follows the applicable client, browser and operating-system requirements.

Open the complete 731-entry source register (PDF) ↗
Platform: project setup and workflows 11 entries

Keep responsibility, review authority and record history explicit.

  • Project identity and settings

    Maintain the job identity, participating parties and supported administrative settings.

  • Contract basis

    Record contract details, notice to proceed and the relevant review/payment clock inputs.

  • Project team and routing

    Configure responsible organizations and supported review routes for each record type.

  • Distinct actions

    Separate creating, submitting, responding, reviewing, verifying and approving according to effective authority.

  • Current ball-in-court

    Identify the current responsible party and workflow state.

  • Multi-step / parallel review

    Use supported route and approval semantics with accountable transitions.

  • Route revisions and history

    Preserve earlier route steps and decisions when a current route is amended.

  • Content sealing

    Bind supported certifications and finalized records to their content identity and attribution.

  • Linked corrections

    Create eligible correction revisions while preserving original sealed RFI/submittal content.

  • Forms and signatures

    Use configured templates and supported signing workflows with required fields and signing authority.

  • Audit events

    Retain attributable record and status history across governed workflows.

Scope and availability: Routes differ by record type and project configuration. A content seal records identity and attribution, not the correctness of an engineering judgment.

Open the complete 731-entry source register (PDF) ↗
Platform: Living Project and Energy TRACE 11 entries

Bring supported project records into a current, permission-aware investigation workspace.

  • Current project-world view

    Combine authorized RFIs, submittals, schedules, drawings, field observations and available energy records.

  • Evidence freshness and coverage

    Show the age and coverage of available information rather than implying complete live awareness.

  • Selected gap detection

    Identify supported missing answers, references, assignments and review information.

  • Investigation drafts

    Prepare source-linked next-step drafts from selected findings.

  • Owner settings

    Control eligible monitoring and learning through authorized opt-in settings.

  • Bounded scan execution

    Retain scan progress and handle eligible retry, resume, pause and stalled work.

  • Outcome feedback

    Record accountable adjudications with source-version context.

  • Priority and calibration review

    Evaluate supported candidates against later records before adoption.

  • Reusable read-only investigations

    Activate supported tested workflow patterns under owner control.

  • Schedule rehearsal

    Explore bounded imported-network scenarios and retain assumptions and calculation evidence.

  • Manual energy readings

    Record energy, fuel and demand separately with units, time and source attribution.

Scope and availability: The Living Project workspace and the asset/sensor intake are complementary foundations. They do not currently constitute a fully synchronized operational digital twin.

Open the complete 731-entry source register (PDF) ↗
Platform: extended project operations 12 entries

Additional setup, commercial handoff and exchange functions included in the reviewed platform.

  • Project operating profile

    Record supported sector, delivery method, contract duration and site coordinates.

  • Sourced contract clocks

    Associate clock settings with the applicable source and delivery-evidence requirements.

  • Recoverable project deletion

    Use eligible trash/recovery controls alongside archive and lifecycle permissions.

  • Preconstruction clearances

    Track readiness, award/agreement clearances, authorities, organization policies and follow-ups.

  • Procurement and long-lead items

    Maintain supported procurement-item tracking and mobilization/NTP handoff information.

  • Takeoff calibration and measurements

    Record supported source calibration and measurements before relying on derived quantities.

  • Bid-basis capsules

    Retain supported source-basis information with controlled estimate publishing and handoff.

  • Schedule acceptance and history

    Record acceptance/rejection, supported mappings, activity data and analysis history for imported versions.

  • Billing findings and exports

    Review payment-application findings and prepare supported accountant exports.

  • Accounting exchange setup

    Maintain supported mappings, dry runs, approved exchange and reconciliation; an external provider must be configured and supported.

  • Portfolio reporting

    Use supported cross-project summaries and export under effective account access.

  • Field-client governance

    Apply licensed project, organization and person-level controls to eligible field-client operations.

Scope and availability: Configured agreements and signatures are not an unrestricted legal contract-authoring system. Generalized Workflow Studio, fleet/GPS intelligence and comprehensive offline resilience are not established by these functions.

Open the complete 731-entry source register (PDF) ↗
TRACE Continuum: project-state and missing-proof foundation 8 entries

Deployed on-demand foundation; its evidence compilation is distinct from a fully verified digital twin.

  • Cross-register state compilation

    Compile accessible schedule, labor, change, billing, meetings, permits, safety, quality, daily and integration record state.

  • Typed evidence presentation

    Distinguish facts about stored records from assertions in those records, unsupported proof and restricted registers.

  • Unsealed record citations

    Provide scoped database references with explicit unsealed status and bounded per-register coverage.

  • Accepted-schedule gate

    Distinguish submitted schedule versions from the recorded accepted schedule of record.

  • Missing-Proof Radar

    Expose absent records and domain evidence that has not yet been verified.

  • Authority-aware proof requests

    Prepare reversible proof-request text with the current brief attached only for an authorized preparer; no automatic sending or record insertion.

  • Review-bundle export

    Download state, references, refusals, authority and draft/refusal as JSON with a payload SHA-256 fingerprint, not a digital signature.

  • Fresh-state controls

    Refresh state, reject stale results and explain restricted access without inferring authority from an administrator title.

Scope and availability: Continuum continuous compilation and integrated sealed-evidence verification are separate unfinished work. The released contract workspace has its own signed journal and portable archive; that does not automatically complete their integration into Continuum.

Open the complete 731-entry source register (PDF) ↗
Customer demonstration, onboarding and reuse 23 entries

Recent public-demo and account-reuse development.

  • Shared synthetic project story

    Prepare one coherent fictional park/restroom project with linked construction records.

  • RFI evidence examples

    Populate ten fictional RFIs with supporting sample PDFs and source relationships.

  • Material submittal examples

    Include CMU, concrete, doors, pavers and drinking-fountain submittal examples.

  • Prepared transmittal and pay examples

    Provide labeled transmittal covers and a draft pay-application summary.

  • Complex change examples

    Populate multiple detailed change orders linked to the synthetic project story.

  • Schedule and look-ahead examples

    Populate baseline/update and look-ahead examples for read-only exploration.

  • Permits and job-walk examples

    Populate candidate permits and a multi-item field walk with related evidence.

  • Procurement and budget examples

    Link fictional procurement items to submittals/activities and populate budget lines.

  • Preconstruction checklist examples

    Assign and date the prepared preconstruction checklist in the demonstration.

  • Real synthetic IFC processing

    Process the fictional BIM model through TRACE extraction; the recorded demo has geometry for 49 modeled objects.

  • Visitor read-only boundary

    Candidate visitor controls deny uploads, mutations, processing, live AI execution and unauthorized account-directory access.

  • Registration and access expiry

    Candidate visitor registration, verification, expiration and functional-demo request forms remain under integration acceptance.

  • Section completeness audit

    Audit meaningful contents and detail views across 38 project sections; an HTTP success alone does not close the section.

  • Training coverage development

    Track section guidance, examples and training-video gaps separately from the sample data.

  • Blueprint tenant reuse

    Recorded staging acceptance exports/imports a blueprint into a new tenant with empty destination business records.

  • Destination publication and write

    Validate independent destination publication, authorized writes, suspended writes and cross-tenant denials.

  • Signed customer setup journey

    Accepted on current isolated staging: expired setup link denied, normal password setup and correct-tenant login passed, and reused setup POST was rejected.

  • First-login navigation correction

    The corrected same-origin /app.html navigation passed normal-browser acceptance, including original-password login after attempted setup-link reuse and logout.

  • Native parsed demo schedule

    The synthetic project has an accepted-for-training MS Project XML revision with 25 activities, 34 finish-to-start links and 66 working days; the actual risk builder consumes it.

  • Published synthetic BIM model

    The real extraction produced 49 geometric products and 52 hierarchy/element records, published inside the synthetic project.

  • Indexed demonstration references

    The newest demo additions include seven indexed PDFs totaling 18 pages, four plan sheets and four drawing images.

  • Web-service file readability

    The demo owner corrected folder ownership and verified 46 of 46 files readable by the web-service user.

  • Prepared internal demo access

    The synthetic project and records exist in a separate live tenant. Public visitor signup/access, full section acceptance and training remain separate work.

Scope and availability: The shared public visitor experience remains in preparation at this checkpoint. Synthetic examples are not customer work, physical inventory or completed approvals.

Current update (September 9, 2026): the shared synthetic project is now published through private, seven-day, read-only visitor sessions. Uploads, edits, processing and live AI execution remain disabled. This supersedes the earlier preparation checkpoint in the source register.

Open the complete 731-entry source register (PDF) ↗

TRACE Intelligence & knowledge

TRACE Intelligence: assistance and reasoning 11 entries

Evidence-grounded assistance for construction administration, investigation and preparation.

  • Ask TRACE

    Ask typed or voice questions, including informal wording and follow-ups. Choose quick lookup, an answer with sources or detailed investigation; edit scope-specific suggested questions before sending.

  • Product help and training

    Find screen guidance, navigation help and explanations of supported workflows through a separate product-help knowledge base.

  • Project-context assistance

    Use authorized project documents and supported structured records as evidence for project questions.

  • Structured interpretation

    Separate recorded facts, inferred consequences, assumptions, competing evidence and missing information.

  • Risk and schedule reasoning

    Explain supported implications, highlight missing logic, calendars or baselines, and propose a next verification step.

  • Cited answers and support checks

    Attach source references to supported findings; identify insufficient evidence rather than invent a project determination.

  • Answer, draft, classify, compare and educate

    Supported queued assistance tasks prepare material in an authorized record context, subject to evidence and access controls.

  • Professional decision boundaries

    Keep formal engineering, safety, legal, approval and permission-to-build decisions with the authorized person.

  • Run history and accountability

    Retain AI activity, run identifiers, source context and supported review/feedback information.

  • Request recovery

    Recover eligible long-running requests with the same request key and avoid duplicate model calls for repeated submissions.

  • Voice interaction where available

    Use supported voice entry/output subject to browser, device permissions and configured service availability.

Scope and availability: AI availability depends on the enabled module, configured provider and usage allowance. Fluent output is not evidence of correctness.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: enforced evidence boundaries 10 entries

Source selection is enforced before evidence reaches the reasoning model.

  • This project

    Restrict retrieval to the current authorized tenant and project, with matching source and passage identity.

  • General knowledge

    Search eligible shared reference material without carrying project context into that search.

  • Combined search

    Use the authorized project plus separately identified general references; do not mix in another project.

  • Web research boundary

    Project-only and combined project-bearing prompts do not use public web research. Permitted general research is a separate path.

  • Source authority

    Distinguish project records, reviewed references, general guidance and assertions; a reference is not automatically a governing requirement.

  • Edition and adoption context

    Retain available edition, jurisdiction and applicability metadata so the user can establish the controlling source.

  • Permission-aware retrieval

    Apply current access rights to records and evidence, including API and queued worker paths.

  • Scope-switch reset

    Clear prior questions, answers, citations and voice state when changing source scope.

  • Late-response protection

    Reject stale results after account, tenant, project, source-mode or relevant revision changes.

  • Project-private improvement records

    Keep failure curricula scoped and private; do not turn one customer's questions or project documents into another customer's knowledge.

Scope and availability: Shared general references and project-private evidence remain distinct. General references must be evaluated for actual project applicability.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: documents, extraction and proof 11 entries

Turn supported files into inspectable evidence while preserving their source identity.

  • Digital document ingestion

    Extract supported born-digital documents into searchable passages with source and page context.

  • Scanned PDF and image OCR

    Retain extraction method, page identity and available confidence/region metadata for scanned notes and images.

  • Page-preserving reference extraction

    Retain native PDF page numbering and layout-oriented text; open the original PDF page to verify tables, symbols and context.

  • Immutable source identity

    Use content fingerprints and revision links to identify the exact evidence used.

  • Source-linked passage retrieval

    Search relevant passages and supported structured project facts rather than treating all text as equally authoritative.

  • Citation inspection

    Open available source references and inspect the cited passage or original document.

  • Proof collection

    Collect supported answer evidence into proof items for review and communication.

  • Proof preview and PDF export

    Preview, print or download supported exhibits, reports and source manifests.

  • Safe upload admission

    Apply supported file validation, scanning and ingestion gates before protected evidence becomes usable.

  • Reference-pack quality checks

    Validate candidate hashes, page counts, page identity, empty/missing pages, safe paths and provenance metadata.

  • Controlled source expansion

    Add eligible references through extraction and quality review; preserve approval states and edition metadata.

Scope and availability: Layout-oriented text does not preserve every visual relationship. OCR alone does not establish dimensions, scale, linework or design intent.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: knowledge library 11 entries

The deployed reference expansion includes eight complete retained federal publications, totaling 524 PDF pages, plus 24 original TRACE workflow guides.

  • Electrical engineering

    UFC 3-501-01: electrical engineering reference material with page-linked source access.

  • Mechanical / HVAC

    UFC 3-410-01: heating, ventilation and air-conditioning reference material.

  • Civil engineering

    UFC 3-201-01: civil engineering reference material.

  • Plumbing

    UFC 3-420-01: plumbing systems reference material.

  • Cost estimating

    UFS 3-740-05: construction cost-estimating reference material.

  • Schedule specifications

    UFGS 01 32 01.00 10: project schedule guide specification.

  • Quality control

    UFGS 01 45 00: quality-control guide specification.

  • Safety requirements

    UFGS 01 35 26: governmental safety requirements guide specification.

  • Existing reference records

    Eligible existing Greenbook and selected OSHA reference records remain subject to their recorded rights, readiness and approval states.

  • Workflow knowledge

    Original TRACE guidance explains common processes. Eligible exact guide matches can return cited guidance without a model call; the complete title index appears later in this document.

  • Source transparency

    Retained editions, original PDF links and extraction provenance identify what is actually in the deployed pack.

Scope and availability: This is not an all-codes library. Referenced commercial standards are not included by reference. Full OSHA, FHWA and GAO libraries were not added by this expansion; full Greenbook fidelity was not newly certified.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: drafting and action preparation 9 entries

Prepare the next step while keeping issuance, approval and contractual decisions under human control.

  • RFI assistance

    Investigate a question using authorized evidence and prepare supported wording or next-step guidance.

  • RFI follow-up draft

    Generate an editable follow-up from the current RFI and workflow record; nothing is automatically sent or issued.

  • Change-review worksheet

    Prepare a structured review draft tied to the current record, with missing evidence left visible.

  • Daily narrative assistance

    Rewrite submitted daily notes into an editable narrative with fact-preservation checks.

  • Submittal preparation support

    Use cited assistance to prepare questions and review material alongside the separate accountable submittal workflow.

  • Notice and correspondence preparation

    Use supported drafting assistance with authorized context; review the controlling clauses and factual basis before use.

  • Living Project investigation drafts

    Prepare source-linked drafts from selected evidence gaps for an authorized reviewer.

  • Reusable investigation workflows

    Propose and evaluate bounded read-only investigation patterns from reviewed outcomes before owner activation.

  • Formal-action separation

    An AI draft or recommendation does not itself approve a submittal, close an inspection, issue a notice or change the contract.

Scope and availability: A follow-up template is not an autonomous legal analysis. Autonomous bid-protest issuance and a comprehensive automated technical submittal compliance matrix are not delivered claims.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: risk and forward workload 10 entries

Interpret recorded project conditions and make missing inputs visible.

  • Project risk assessment

    Review supported project risk evidence, record context and identified gaps.

  • Confidential forward look

    Show cumulative 7-, 14- and 30-day RFI/submittal review due horizons in the authorized confidential assessment.

  • Overdue and aging work

    Identify overdue, undated and aged actions without inventing missing deadlines.

  • Separate workflow histories

    Keep RFI and submittal completion rates separate, respecting current route cycles and parallel approvals.

  • Conditional backlog scenarios

    Estimate remaining review workload only when the required positive completion history exists for each active record type.

  • Data sufficiency gates

    Require at least eight positive completions spanning three of four weeks for each active type; return unavailable when the evidence is insufficient.

  • Completion quality filters

    Exclude returned, rejected and future completions from the positive completion basis.

  • Schedule readiness signals

    Highlight missing or stale accepted schedule evidence.

  • Refresh-time operational feeds

    Read current structured workflow and schedule records when the assessment refreshes.

  • Scope and privacy controls

    Keep confidential forecasts out of shared/compact views and reject results for a previously selected project or period.

Scope and availability: These are descriptive workload scenarios, not trained delay probabilities, proof of physical progress, legal causation or a guarantee of future performance.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: visual field-to-plan review 9 entries

Use selected images and a specific plan page to prepare a traceable visual review.

  • Photo and plan inputs

    Submit supported field images and select the relevant PDF plan page for comparison.

  • Exact revision and page binding

    Bind the review to the source plan revision and selected page rather than an unspecified drawing set.

  • Multimodal interpretation

    Use the configured vision provider to analyze the selected image evidence and plan page together.

  • Reviewable observations

    Present supported observations, uncertainty and information requiring field confirmation.

  • Evidence-linked persistence

    Retain the source references and review output with the authorized record context.

  • Human review notes

    Add accountable review information rather than treating a visual suggestion as an accepted field determination.

  • Response validation

    Validate the provider's structured response, required shapes and completion state before admitting a result.

  • Protected upload workflow

    Use file and page extraction gates; preserve access boundaries across upload, analysis and replay.

  • Stale-view protection

    Prevent a previous project's visual result from replacing the current view.

Scope and availability: Delivered scope is assisted review of selected inputs. Automatic drone-feed monitoring, survey registration, measured alignment deviation, soil-condition diagnosis, automated takeoff from photos and certified installed-work verification are not established.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: bounded learning and monitoring 11 entries

Improve selected workflows through measured, controlled changes rather than autonomous foundation-model training.

  • Scheduled failure capture

    Collect bounded failure signals into private, scoped evaluation curricula.

  • Data-minimized curricula

    Use run references rather than publishing raw customer questions into shared learning material.

  • Curated vocabulary candidates

    Evaluate fixed retrieval aliases for the original public workflow guides.

  • Held-out evaluation

    Compare a candidate on separate labeled cases before activating it.

  • Regression protection

    Require preservation of previously passing cases for the eligible vocabulary candidate.

  • Experiment identity

    Avoid repeatedly tuning identical experiments against the same holdout; reject stale fingerprint selections.

  • Reviewed outcomes

    Record source-versioned human outcomes for selected administrative findings.

  • Calibration candidates

    Evaluate selected priority/calibration changes against later, different records before owner activation.

  • Reusable skill candidates

    Test bounded investigation patterns before activating supported read-only workflows.

  • Opt-in continuous watch

    Process bounded scans, retain progress and recover eligible stalled work with retries, pause and health information.

  • Owner control

    Require the applicable authorization for activation, monitoring and return to baseline.

Scope and availability: No autonomous model-weight training or unrestricted self-modifying code is deployed. Continued improvement needs maintained sources, new validated candidates and evaluation; it is not guaranteed every day or year.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: expanded interpretation, research and proof 15 entries

Deployed additions verified in the interpretation, schedule-reasoning, research and RFI release records.

  • Informal question interpretation

    Handle typos, shorthand, alternate meanings and standard-family hypotheses while retaining the original question.

  • Bounded multi-aspect investigation

    Consider sequence, staging/access, crews, equipment, procurement, temporary works, testing holds, permits, handoffs, mitigation and counterevidence when supported.

  • General-reference explanation

    Explain a standard as general guidance without requiring project adoption; keep binding project determinations separate.

  • No-match research fallback

    Eligible general questions may continue to official public research when related local passages still cannot answer the question.

  • Advanced research fallback

    The documented difficult-general-research fallback uses gpt-6-astra after the primary provider cannot release a cited answer; this is an application component, not a TRACE-trained foundation model.

  • Citation validation

    Validate citation ranges and Unicode offsets; reject incomplete provider output and unsupported assertions rather than releasing partial text as verified.

  • Truthful research history

    Distinguish research actually attempted from a setting merely being enabled; record provider usage and cost.

  • Schedule evidence context

    Provide authorized baseline/latest revision, disposition history, methodology, bounded activities/relationships, import assumptions and exact-version comparisons.

  • Competing delay explanations

    Examine overlapping delays, mitigation and completion impact; distinguish calendar days from working-time float and request missing CPM evidence.

  • Saved Office chart extraction

    Read saved XLSX/PPTX chart series, categories, values, labels, number formats and formula references. Do not evaluate formulas or follow external links.

  • Exact RFI conversation binding

    Load subject, question and references from the authorized RFI ID; preserve linked follow-ups only while that project and RFI remain active.

  • Public proof tools

    Show proof, collect all eligible references, prevent duplicates and print answer proofs through an in-app preview.

  • Direct proof PDF download

    Export supported complete text, tables, technical symbols, citations and eligible original source-page images without depending on the browser print dialog.

  • Mixed proof identity

    Reauthorize indexed passages; distinguish archived source evidence from public URL references that have not been archived.

  • Request replay protection

    Serialize/replay eligible requests by authenticated user and submission key; reject key reuse for a changed question and avoid duplicate model calls.

Scope and availability: Known limits include intermittent P6 answer-release failures, variable research latency, and saved chart caches that can be stale. These are not guarantees of universal answer accuracy.

Open the complete 731-entry source register (PDF) ↗
Living Project: detailed reviewed-learning controls 11 entries

Implemented opt-in administrative improvement; activation and usable evidence are prerequisites.

  • In-project reviewed outcomes

    Retain explicit source-versioned human adjudications and append-only corrections within the project.

  • Chronological source-disjoint evaluation

    Evaluate on later unseen records rather than reusing the same source in training and testing.

  • Reviewer diversity gates

    Apply minimum distinct-record and reviewer-diversity/concentration requirements before eligible candidate promotion.

  • Baseline and incumbent comparison

    Compare eligible ranking candidates against baseline/current behavior, including per-kind regression and Brier-score checks.

  • Bounded learning history

    Refuse candidate promotion from truncated history beyond the supported 2,000-review cap.

  • Correction invalidation

    Invalidate dependent learning when source evidence is corrected or access is revoked.

  • Owner promotion and rollback

    Keep candidate activation explicit and permit return to the baseline.

  • Declarative skill proposals

    Propose read-only investigation patterns from repeated substantiated outcomes; test later reviewed records before owner activation.

  • Resumable monitoring

    Use bounded source generations, durable cursors, fenced leases and atomic finding/checkpoint writes.

  • Fair scheduling and suspension

    Process due projects with fresh authorization, retry/pause behavior and owner opt-out; do not treat platform support as unattended authority.

  • Uncertainty-reduction scenario

    Compare supported paired readiness/duration scenarios and identify the next fact that reduces remaining uncertainty.

Scope and availability: Learning currently covers selected administrative RFI/submittal finding kinds. Metrics are observational and exposure-biased, not foundation-model retraining, physical verification or guaranteed improvement.

Open the complete 731-entry source register (PDF) ↗
TRACE Intelligence: deeper evidence and learning architecture 13 entries

Detailed implementation distinctions retained from the AI audit.

  • Deterministic clarification

    Offer bounded follow-up choices for broad construction questions without reading private evidence or spending model tokens.

  • Structured field-day evidence

    Retrieve authorized daily, job-walk, quality, safety and time-record facts with operational citations.

  • Sourced contract clocks

    Include clock settings only with explicit source, day count and working/calendar basis; do not substitute unsourced settings for contract terms.

  • Authority, applicability and operativity

    Distinguish retrieval relevance from controlling authority, effective time, jurisdiction, project area/system/phase and amendment effects.

  • Qualifying evidence lanes

    Retain exceptions, conditions, alternatives and supersession alongside direct matches; a classifier alone does not establish a legal conflict.

  • Optional exact-evidence review

    A separately configured reviewer can assess a draft against its cited passages without browsing, retrieving new evidence, adding citations or executing actions.

  • Private shadow curriculum

    Capture corrections, rejections, no-match and escalation signals into a scoped curriculum. This shadow layer does not itself change live answers.

  • Measured public-guide retrieval improvement

    A fixed 31-alias candidate improved one small held-out top-topic evaluation from 14/18 to 15/18 while preserving eligible passing cases; this is not general answer accuracy.

  • Fingerprint-bound retrieval activation

    Bind eligible activation to pack, dataset, algorithm and registry identities; corrupt or stale state falls back to baseline.

  • Route-aware workload counting

    Count any-one review groups once at the earliest due action, all-required groups separately, and exclude inactive future steps.

  • Recovery semantics gate

    The resource-recovery planner supports bounded unstarted fixed-duration DAGs with FS/nonnegative lag and ASAP/SNET releases plus explicit calendars. Unsupported SS/FF/SF, actual progress, splitting, overtime and inferred productivity are refused.

  • Narrative fact preservation

    Rewrite supplied daily notes in English or Spanish while preserving facts, numbers, negations and uncertainty; do not add unsupported blame or causation.

  • Provider-team distinction

    Gemini, Grok and Claude consultations helped development reviews; they are not established as a three-provider vote on every customer answer.

Scope and availability: Reference extraction is automated rather than named human fidelity review. Attempted but blocked GAO, OSHA 3886 and USACE CQM source downloads were not ingested. UFS is a nonmandatory reference and UFGS documents are templates requiring tailoring/adoption.

Open the complete 731-entry source register (PDF) ↗
Internal TRACE viewer and controller 14 entries

Integrated customer-panel viewing and review controls; original source files remain preserved.

  • Internal document viewer

    Open supported authorized PDF/image documents inside TRACE, navigate available pages and download the original.

  • Internal CAD workspace

    Choose a current-project DWG and exact version, then open the converted drawing inside BIM without requiring an external CAD application for the supported review functions.

  • Internal 2D controller

    Select entities, search source handles, pan, zoom, fit, switch layers, restore converted visibility, add notes, draw polylines and measure approximate XY distances.

  • Internal XYZ controller

    Orbit, pan, zoom and fit source XYZ line/point geometry; apply explicit Z-range, zero-Z and vertical-display controls. The 2D layer switches do not automatically filter this XYZ view.

  • Internal solid-surface controller

    Select one actual POINT layer, build the shaded surface, inspect low/high colors, toggle points/wireframe and apply maximum-edge and display-scale controls.

  • Internal IFC controller

    Use object tree/search, picking, selected-object fit, isolation/show-all, top/front orthographic views, isometric perspective, X/Y/Z section cuts, wireframe and reset.

  • Source/geometry distinction

    IFC-derived GLB is served as a checked derivative; this does not establish arbitrary public GLB/glTF upload support or automatic mapping of every mesh to an IFC element.

  • Coordinate/reference controller

    Select actual points or separate block anchors, inspect original XYZ, export/print chosen rows and label a selected actual point as an unverified reference marker.

  • Version and integrity controller

    Bind viewing, annotations, evidence links and geometry to source/version fingerprints; reject stale or mismatched outputs.

  • Review and publication controller

    Apply current source cleanliness, status, license and actor permissions; IFC publication and provisional CAD review remain distinct workflows.

  • Conversion controller

    Dispatch bounded native extraction, use private identity-bound caches, report supported/omitted geometry and recheck access after processing.

  • Print/export controller

    Prepare supported drawing, elevation, surface, coordinate and document-page outputs with applicable source identity, units and display settings.

  • Format boundaries

    DWG and IFC/IFCZIP have production review paths. PDF/images use document/markup paths. The richer direct DXF/3DFACE successor has accepted isolated staging integration; native RVT/DGN/SKP and arbitrary format conversion still require separate work.

  • Editing boundaries

    TRACE review annotations do not rewrite the DWG/IFC design. IFC dimensioning, capped section solids, survey-certified benchmarks and approved final grading are not supplied merely by viewing.

Scope and availability: This is TRACE's internal review viewer/controller, not a full AutoCAD/Civil 3D/Revit authoring replacement. Section cuts are uncapped; camera ground/shadows are display aids, and geometry completeness remains source-dependent.

Open the complete 731-entry source register (PDF) ↗
Latest AI / operations release: September 9, 2026 8 entries

Implemented release with 155 passing tests: 112 PHP tests (384 assertions), 37 voice tests and six browser fixture tests; TypeScript typecheck also passed.

  • Telephone interruption fix

    The response queue now waits while the caller speaks, coalesces overlapping turns and supports caller interruption. The user reported the real-call test passed as natural and responsive.

  • Source-specific research

    Explicit official-source requests bypass the original workflow-guide shortcut; literal exclusions of project records are respected while private identifier protections remain in place.

  • Live official-citation acceptance

    The tested RFI question returned official public-web citations to USACE CQM guidance and Caltrans Source Inspection Guidelines, with no project records used.

  • Immediate support and troubleshooting

    Get help now provides four current workflow guides, typed product guidance, clear source labels, retained inputs/errors and a human-ticket handoff path.

  • Current product guidance

    Web and telephone guidance covers My Apps/App Factory, Undo/Redo, loading, support, training and billing boundaries.

  • Private improvement cycle

    Completed a private cycle containing seven failure signals, two scoped curricula and two new versions. No model weights, live answer behavior or promotion changed; no autonomous training.

  • Billing readiness checks

    A read-only, secret-free check identifies missing merchant credentials, webhook configuration and plan setup. Live paid launch remains blocked pending configuration and financial acceptance.

  • Support interaction isolation

    Support guidance no longer triggers a legacy acceptance toast; topic selection does not approve or seal a project record.

Scope and availability: The real-call result is one user-reported acceptance, not two independently identified calls or a statistical audio benchmark. Live research is a tested example, not universal accuracy. Human handoff is a ticket path, not a continuous staffing promise. No live charge, refund or subscription was attempted.

Open the complete 731-entry source register (PDF) ↗
Complete original workflow-guide index 24 entries

Retained 24-guide pack; these are original workflow explanations, not adopted contract requirements.

  • Getting started with TRACE

    Original TRACE guidance available to eligible workflow retrieval.

  • Asking TRACE a useful question

    Original TRACE guidance available to eligible workflow retrieval.

  • Writing and tracking a request for information (RFI)

    Original TRACE guidance available to eligible workflow retrieval.

  • Preparing a submittal for review

    Original TRACE guidance available to eligible workflow retrieval.

  • Finding the right drawing and revision

    Original TRACE guidance available to eligible workflow retrieval.

  • Organizing project files and document records

    Original TRACE guidance available to eligible workflow retrieval.

  • Writing a useful daily report

    Original TRACE guidance available to eligible workflow retrieval.

  • Taking and labeling useful site photos

    Original TRACE guidance available to eligible workflow retrieval.

  • Preparing and recording an inspection

    Original TRACE guidance available to eligible workflow retrieval.

  • Recording and escalating a safety concern

    Original TRACE guidance available to eligible workflow retrieval.

  • Reviewing time entries and field days

    Original TRACE guidance available to eligible workflow retrieval.

  • Turning meetings into clear action items

    Original TRACE guidance available to eligible workflow retrieval.

  • Building a practical lookahead plan

    Original TRACE guidance available to eligible workflow retrieval.

  • Tracking materials and long-lead items

    Original TRACE guidance available to eligible workflow retrieval.

  • Keeping change requests and approvals distinct

    Original TRACE guidance available to eligible workflow retrieval.

  • Reading a project budget carefully

    Original TRACE guidance available to eligible workflow retrieval.

  • Preparing a payment application record

    Original TRACE guidance available to eligible workflow retrieval.

  • Organizing permit and authority correspondence

    Original TRACE guidance available to eligible workflow retrieval.

  • Planning closeout and turnover information

    Original TRACE guidance available to eligible workflow retrieval.

  • Managing punch lists and remaining work

    Original TRACE guidance available to eligible workflow retrieval.

  • Using a transmittal to explain what was sent

    Original TRACE guidance available to eligible workflow retrieval.

  • Coordinating models and markups

    Original TRACE guidance available to eligible workflow retrieval.

  • Using forecasts alongside field observations

    Original TRACE guidance available to eligible workflow retrieval.

  • Understanding citations, uncertainty, and corrections

    Original TRACE guidance available to eligible workflow retrieval.

Scope and availability:

Open the complete 731-entry source register (PDF) ↗
Complete retained publication index 8 entries

Eight retained publications totaling 524 PDF pages. Editions below describe the retained pack, not a claim of current editions.

  • UFC 3-501-01 Electrical Engineering

    27 November 2024; 96 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFC/ufc_3_501_01_2024.pdf

  • UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems

    28 July 2025; Change 1, 23 January 2026; 63 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFC/ufc_3_410_01_2025_c1.pdf

  • UFC 3-201-01 Civil Engineering

    20 December 2022; Change 1, 1 June 2026; 68 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFC/ufc_3_201_01_2022_c1.pdf

  • UFC 3-420-01 Plumbing Systems

    1 April 2021; 72 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFC/ufc_3_420_01_2021.pdf

  • UFS 3-740-05 Construction Cost Estimating

    2 February 2026; 112 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFC/ufs_3_740_05_2026.pdf

  • UFGS 01 32 01.00 10 Project Schedule

    August 2026; 24 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2032%2001.00%2010.pdf

  • UFGS 01 45 00 Quality Control

    August 2023, Change 4 August 2026; 51 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2045%2000.pdf

  • UFGS 01 35 26 Governmental Safety Requirements

    May 2024, Change 2 August 2026; 38 PDF pages; https://legacy.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2035%2026.pdf

Scope and availability:

Open the complete 731-entry source register (PDF) ↗
New release: source-linked assessment review 18 entries

Released advisory assessment controls added after the previous catalog.

  • Answer-unit review

    Split complete answer paragraphs and printable findings into server-created, hashed review units.

  • Complete finding review

    Include finding titles and applicability text in review rather than examining only selected snippets.

  • Independent structured review

    Return one review result per unit with source references, claim kind, assertion polarity and prerequisite states.

  • Review coverage validation

    Reject omitted, duplicate or unknown units and evidence references outside the supplied source set.

  • Three-state prerequisites

    Represent each condition as supported, contradicted or unknown; unknown does not become satisfied.

  • Conjunctive condition checking

    Require all stated prerequisites to be supported before releasing a positive assertion that they are met.

  • Qualified uncertainty

    Allow an honest statement that acceptance or applicability is unproven without treating it as a positive claim.

  • Material qualification retention

    Require each material summary or finding to retain its relevant conditions; another paragraph cannot silently repair an omission.

  • Whole-answer completeness

    Block truncated answers and materially unanswered requests through explicit completeness review.

  • Authority-promotion prevention

    Avoid converting a reported execution or relevant document into verified incorporation, approval or controlling authority.

  • Missing-adoption distinction

    Do not infer that terms are legally nonbinding merely because their adoption evidence is absent.

  • Source-conditioned notice language

    A narrow guard checks identified suspension statements for supported notice and undisputed-invoice qualifications.

  • Complete reviewer evidence

    Supply passage text, source hashes, passage hashes and page locators to the reviewer.

  • Review audit records

    Retain unit hashes, prerequisite outcomes, evidence references, expected counts and reviewer details.

  • Adversarial regression capture

    Turn observed truncation, omitted conditions, false authority promotion and incorrect refusal into regression cases.

  • Independent reference-answer consultation

    Claude, Gemini and Grok reviewed anonymized supplied sources and corrected reference wording; their acceptance applies to that wording, not certification of TRACE software.

  • Advisory assessment acceptance

    The recorded final suite passed 19 adversarial reviewer cases and a complete live assessment; software checks covered 91 tests and 305 assertions.

  • Human verification step

    Name the missing or governing records and the authorized person's next verification action before consequential decisions.

Scope and availability: Semantic interpretation remains model judgment. This is evidence-backed advisory assistance, not guaranteed legal correctness or an autonomous construction manager.

Open the complete 731-entry source register (PDF) ↗

Documents & drawings

Platform: documents, plans and field evidence 11 entries

Organize files, drawings and daily records around their project context.

  • Project document workspace

    Upload, organize and retrieve authorized project files with source identity and extraction status.

  • Plan sets and sheets

    Register plan sets and sheet records, including supported proposals from uploaded documents.

  • Human-attested registration

    Review proposed sheets and bulk-register supported records with attribution.

  • Immutable plan revisions

    Retain prior sheet versions and formal review context.

  • Internal document markup

    Select a supported PDF/image page, annotate it and use the authorized sharing workflow while preserving original bytes.

  • Plan revision comparison

    Compare extracted statements and metadata between authorized revisions of the same sheet.

  • Photo and media records

    Store project images and attachments with content provenance.

  • Daily reports

    Capture field work, labor/equipment context and supporting media in the daily record.

  • Signed daily records

    Use supported signature/seal workflows and append corrections rather than overwriting finalized content.

  • Weather intelligence

    Use project-coordinate forecasts, the current weather bar, ten-day outlook and source-linked weather notices.

  • Daily Project Success Brief

    Produce a deterministic cited position statement from supported sealed records and contract clocks, including freshness and explicit unknowns.

Scope and availability: Text comparison does not compare all pixels or geometry. Forecasts are external observations, not proof that work was weather-delayed.

Open the complete 731-entry source register (PDF) ↗
Platform: source administration and media 10 entries

Additional document, knowledge and field-record tools included in the platform inventory.

  • TRACE Atlas source administration

    Upload eligible reference sources, track ingestion and manage source versions under the applicable authority.

  • Source review queues

    Review extraction/readiness and verification status before eligible material is used as grounded evidence.

  • Source relationships

    Maintain supported relationships between references and preserve provenance context.

  • Access classifications

    Apply supported document/source classifications in addition to tenant and project permissions.

  • Quarantine handling

    Keep unsafe or unready uploads out of the usable evidence path and expose supported status information.

  • Resumable media uploads

    Use supported large-file upload handling for project media.

  • Media organization

    Maintain descriptions, location metadata, collections, evidence links and previews.

  • Media archive and restore

    Archive and restore eligible media under current authority.

  • Field-day archive

    Retain supported daily field records and printable daily outputs.

  • TRACE Sign

    Prepare, send or void supported signature envelopes; delivery and provider availability are configuration dependent.

Scope and availability: Source verification status does not establish universal technical correctness. Access to the source administration tools is role dependent.

Open the complete 731-entry source register (PDF) ↗
Shared markup editor additions 3 entries

Deployed document-page editing improvements.

  • Undo and redo

    Restore up to 100 supported annotation changes, including grouped clear operations.

  • History branching

    Invalidate redo after a new edit; retain native text-input undo behavior.

  • Page and source isolation

    Reset markup history on project/source-version/page changes, cancellation and successful send.

Scope and availability:

Open the complete 731-entry source register (PDF) ↗
Document, RFI and tracker workflow refinements 17 entries

Delivered RFI, document and tracker refinements from reviewed release records.

  • Record-specific Ask TRACE

    Bind the exact authorized RFI identity, subject, question and references to the conversation and retain that context only while the matching project/RFI stays active.

  • Historical response separation

    Display superseded responses as history while directing current action to the active correction.

  • Named seal attribution

    Resolve recorded actors to names and timestamps instead of showing only internal identifiers.

  • Correct document parties

    Use the recorded issuing/originating and receiving organizations in the corresponding preview.

  • Separate RFI and submittal printing

    Use record-specific Preview / print RFI and Preview / print submittal controls and headings.

  • Shared issued-document register

    Retain explicit issued status and distinguish issued documents from generated previews.

  • Authorized original attachment viewing

    Retrieve the submitted original under current account/project permission, with page navigation and download where supported.

  • Unsigned original preservation

    Preserve the unchanged unsigned original while the supported review workflow creates separate signed copies for individual reviewers.

  • Final required-approver seal

    Keep intermediate signed review copies separate from the final seal after the last required approval.

  • Member template previews

    Permit eligible project members to preview templates while requiring template-management authority for edits.

  • Revision-preserving template edits

    Create a new template revision without invalidating earlier assignments or signatures.

  • Resumable submittal attachments

    Use bounded upload chunks and finalized attachment identity to avoid duplicate or partial attachments; the recorded implementation uses 8 MB chunks.

  • Governing-document conflict controls

    Record unrecorded, confirmed or conflicting precedence with citations, ordered categories and conflict notes; do not silently choose between conflicting provisions.

  • Printable download fallback

    Provide a self-contained printable document when an embedded host blocks the standard print window.

  • Tracker validation guidance

    Give actionable feedback for empty generation prompts, tracker names, missing fields, empty labels and empty choice lists.

  • Responsive tracker keyboard access

    The deployed studio includes tested responsive layouts, keyboard access and reduced initial clutter on small screens.

  • Demo weather role coverage

    The live demo location/weather correction provides current conditions and a 10-day forecast to the four configured demo roles.

Scope and availability: Viewing, previewing and printing do not issue, seal or approve records.

Open the complete 731-entry source register (PDF) ↗

CAD, BIM & survey points

3D / BIM: model intelligence 11 entries

Inspect real IFC-derived geometry and its relationship to the uploaded source.

  • IFC and IFCZIP admission

    Upload supported models to an authorized project container with an immutable version and source fingerprint.

  • Queued extraction

    Extract supported IFC identity, hierarchy, objects and properties through the conversion worker.

  • Searchable model manifest

    Find extracted elements and inspect properties with authorized project/version context.

  • Human publication gate

    Review, publish or reject model versions; viewing rights depend on authority and publication state.

  • Derived GLB geometry

    Convert supported IFC geometry to a self-contained browser-viewable model.

  • Opening integrity

    Exclude Boolean cutter solids from displayed meshes while retaining actual host opening subtraction.

  • Conversion coverage

    Show represented, converted, excluded-feature and missing-geometry counts, with an explicit completeness result.

  • Coordinate metadata

    Report available units and axis basis; display centering does not rewrite source coordinates.

  • Source-to-geometry verification

    Check original source bytes, derived geometry bytes, lengths and fingerprints against the version binding.

  • Serving-time authorization

    Recheck actor, project, version and status before serving verified geometry.

  • BCF coordination exchange

    Import supported BCF 2.1 issues into the staging register and export authorized issues.

Scope and availability: Native Revit ingestion, cross-model federation and automatic BIM-to-asset linkage are not established. Bounded single-IFC coordination candidates were subsequently deployed and are listed below.

Open the complete 731-entry source register (PDF) ↗
3D / BIM: interactive viewing 11 entries

A construction-related example is automatically available from every project BIM panel.

  • Smooth orbit, pan and zoom

    Inspect the model using interactive camera controls and short animated view transitions.

  • Element tree and search

    Find and select individual rendered objects; display authorized names when available.

  • Selection and fit

    Highlight an object and frame the selected geometry.

  • Isolation and show-all

    Focus on selected geometry, then restore the complete model.

  • Section cuts

    Move a cut along X, Y or Z to look inside the model.

  • Orthographic views

    Switch to top or front inspection views, or return to an isometric perspective.

  • Wireframe and reset

    Inspect mesh structure and restore the default view.

  • Rendering quality

    Use antialiasing, controlled pixel density, balanced lighting and ground shadows for a clear model display.

  • Resource cleanup

    Abort obsolete loads and dispose viewer resources when the active scope changes.

  • Source details panel

    Inspect conversion metadata and fingerprints; unavailable details remain explicitly unavailable.

  • Related synthetic example

    Explore a three-storey public-works building with structure, glazing, doors, utility pipes and six opening voids; it creates no project records.

Scope and availability: Section cuts are uncapped visual slices. The synthetic example is IFC-derived, not a reconstruction from photographs or a survey-certified model.

Open the complete 731-entry source register (PDF) ↗
CAD and solid elevation review 19 entries

Deployed customer-panel capabilities added after the earlier public inventory.

  • Automatic CAD availability

    Clean authorized uploaded DWGs appear in the current project BIM CAD workspace.

  • Direct Open CAD

    Open the selected drawing revision from Documents; keep original download and version history available.

  • Review-pending viewing

    Provisional review status no longer alone blocks the CAD viewer; viewing does not approve the source, bypass quarantine or widen access.

  • Native bounded conversion

    Convert supported DWG geometry through an isolated native worker; preserve original source bytes and report unsupported entities and missing references.

  • 2D drawing controls

    Pan, zoom, fit, show/hide layers, restore converted visibility and find/select supported entities.

  • CAD annotations

    Create notes, polylines and approximate XY distance annotations bound to the exact version and source fingerprint.

  • Append-only markup history

    Retain saved drawing annotation history without overwriting the original drawing.

  • XYZ elevation view

    Inspect actual source line/point coordinates in 3D with orbit, pan and fit controls.

  • Elevation display filters

    Choose a Z range, optional zero-Z exclusion and explicitly labeled 1x, 2x, 5x or 10x vertical display scale.

  • Solid terrain preview

    Build a shaded height-colored triangulated surface from one selected native POINT layer.

  • Low/high color legend

    Show source-elevation ranges with blue lows and gold highs; optional wireframe and source-point overlays.

  • Surface quality controls

    Report zero-Z exclusions, merged duplicates, conflicting-coordinate exclusions and triangle counts; refuse unusable or collinear input.

  • Gap filtering

    Optionally exclude triangles exceeding a selected edge length. Separate point layers are never automatically pooled.

  • Survey point distinction

    Keep actual native POINT coordinates separate from block-insertion anchors; neither is automatically official survey control.

  • Point selection and filtering

    Filter coordinate candidates by layer/block, select rows and retain exact XYZ rather than substituting attribute labels.

  • Selected-point CSV

    Export selected coordinate rows with units, source/version and unverified status; escape spreadsheet-formula strings.

  • Reference marker

    Mark a selected actual POINT with a visible reference label and XYZ; label remains unverified and does not establish an official benchmark.

  • Drawing and surface printing

    Print current 2D, XYZ or solid-surface views and selected coordinate tables with source identity and applied display settings.

  • Context cleanup

    Abort obsolete loads and dispose graphics resources on tenant/project/source changes; recheck access and source integrity.

Scope and availability: Solid terrain is interpolated point coverage, not certified final grade. The reviewed grading file has separate point patches and missing references; approved proposed-surface identity, boundaries, breaklines, CRS and datum remain unverified.

Open the complete 731-entry source register (PDF) ↗
IFC / VDC coordination additions 8 entries

Deployed after the original 3D release.

  • Element evidence links

    Associate an exact IFC element/revision with an authorized RFI, submittal or schedule activity and record the reason.

  • Revocable association history

    Preserve link revocation history and recheck access to both model and target record.

  • Revision metadata comparison

    Show added, removed and changed extracted identities/properties between two versions of the same model.

  • Potentially affected links

    Show explicit associations potentially affected by metadata changes while leaving each link bound to its original revision.

  • Intersection candidates

    Run bounded native geometric intersection checks between selected classes within one exact IFC revision.

  • Clearance candidates

    Measure supported separation against the selected tolerance and return candidate pairs for human review.

  • Opening-aware geometry

    Respect host opening subtraction and exclude Boolean cutter objects from the displayed products.

  • Coverage-qualified results

    Report missing geometry and check coverage; incomplete zero-hit results cannot establish a no-conflict conclusion.

Scope and availability: No cross-model federation, RVT authoring, geometric revision comparison, 4D simulation or automatic issue/approval creation is claimed.

Open the complete 731-entry source register (PDF) ↗
CAD successor: direct primitive and parser recovery 14 entries

A separate newer DXF path now has coherent isolated staging and browser acceptance.

  • Direct POINT extraction

    Retain explicit source points with exact source identity and original decimal provenance.

  • Direct LINE extraction

    Retain source line endpoints rather than inferring design lines from rendered pixels.

  • Direct 3DFACE extraction

    Preserve explicit face vertex order and hidden-edge information where supported.

  • Unit provenance

    Carry declared units without silently assigning survey datum or coordinate reference authority.

  • Unknown-reference retention

    Expose missing or unsupported references instead of silently fabricating geometry.

  • Resource-limited parser

    Constrain parsing by entity/vertex/output size, memory, CPU and wall-time limits.

  • Network-disabled parser isolation

    Run the bounded parser with restricted filesystem/network permissions in the tested worker path.

  • Authenticated local socket bridge

    Restrict the application-to-parser interface to its authorized local caller.

  • Lifetime ownership lock

    Bind listener ownership and recovery to its recorded process/socket identity.

  • Recorded listener recovery

    The accepted disposable integration tested listener termination, recovery and subsequent parsing.

  • Incomplete-ownership refusal

    Do not recover an unproven socket/listener identity or crash before durable ownership metadata.

  • Application Documents integration

    The later isolated staging release passed real Documents upload and CAD review.

  • Primitive viewer and printing

    Staging browser acceptance covered one POINT, LINE and 3DFACE, source limits and TRACE-branded print output.

  • Parser release backup linkage

    Bind the accepted staging CAD revision to its encrypted backup/transfer receipts.

Scope and availability: This successor does not replace the released DWG path in production. It does not establish arbitrary Civil 3D semantics, external-reference expansion, certified survey control or final-grade interpretation.

Open the complete 731-entry source register (PDF) ↗
Latest native CAD and synthetic project acceptance 7 entries

Newer verified additions received from the demonstration development owner after the main catalog refresh.

  • Native synthetic DWG admission

    A native DWG is admitted in the separate synthetic project, with 651 terrain POINT coordinates matching the authored CSV, one explicitly unverified reference point and 656 rendered entities.

  • DWG layer visibility correction

    An installed narrow LibreDWG exporter patch preserves layer visibility instead of negating all layer colors and hiding otherwise visible drawing layers.

  • Visible and hidden layer regression

    Both visible-layer and deliberately hidden-layer fixtures passed, together with the real production sandboxed preview under the web-service user.

  • Native BIM control acceptance

    Scoped local viewer acceptance verified 49 mesh loads, IFC tree selection, isolation, fit, top projection, wireframe, section cut, search and source checksum.

  • Linked preaward demonstration estimate

    The synthetic project includes a draft preaward profile and a ten-item estimate, with all ten items linked to plan versions.

  • Unsigned TRACE Sign demonstration

    A synthetic draft envelope contains two fictional recipients, unsigned fields and a two-page PDF; it is not an executed customer agreement.

  • Expanded file integrity acceptance

    Ninety media/document-version file readability, hash and size checks passed for the synthetic demonstration content.

Scope and availability: The converter patch is installed. Synthetic geometry and records do not establish survey authority or real contract approval. Public visitor signup/access remains separate.

Current update (September 9, 2026): public visitor registration and verified read-only access are now live as a separate delivery layer. Synthetic geometry and records still do not establish survey authority or real contract approval.

Open the complete 731-entry source register (PDF) ↗

RFIs & submittals

Platform: RFIs, submittals and communications 10 entries

Manage the formal exchange of questions, responses and review packages.

  • RFI register

    Track questions, subject, responsible parties, references and current review status.

  • RFI supporting context

    Associate specification sections, plan references, related submittals and governed attachments.

  • RFI response workflow

    Record the authorized response, route it through configured review and retain sealed history.

  • Submittal register

    Organize packages by specification section, assigned parties and review clocks.

  • Submittal review

    Capture dispositions, review stamps, certifications and accountable finalization.

  • Unsigned and sealed artifacts

    Preserve supported original/unsigned material alongside the accountable review record.

  • Branded record documents

    Produce supported RFI, submittal, change-order and payment-application covers from the record and account branding.

  • Issued transmittal register

    Maintain append-only issued-document history and source associations.

  • Meeting management

    Prepare agendas, record minutes and action items, and finalize supported meeting records.

  • Communication preparation

    Preview or print supported records and prepare communication through the configured workflow.

Scope and availability: Draft generation and document export are separate from sending, issuing or approving a record.

Open the complete 731-entry source register (PDF) ↗

Field, quality & safety

Assets, sensors and live-source checks 11 entries

Connect structured observations to a protected project record.

  • Project asset registry

    Register an asset with an immutable sensor channel, metric and unit.

  • Manual observation entry

    Enter attributable readings with measurement time and declared units.

  • Authenticated observation API

    Accept authorized client readings with project and tenant checks.

  • Data-quality validation

    Validate decimal precision, time bounds, metric and unit identity; reject conflicting or mismatched observations.

  • Duplicate protection

    Use UUID idempotency and sensor/timestamp deduplication to prevent replayed readings from multiplying records.

  • Channel credentials

    Issue, rotate and revoke scoped sensor credentials with bounded expiry and one-time raw-token display.

  • Credential revalidation

    Check issuer rights, license and project lifecycle at intake; credentials cannot silently switch channels.

  • MQTT 5 / TLS bridge

    Delivered gateway software supports durable buffering, fixed-identity retries, QoS 1 acknowledgment and verified TLS.

  • Energy TRACE

    Keep attributable manual energy, fuel and power-demand readings with units, time and source references.

  • City of Los Angeles permit lookup

    Look up an exact issued-permit number in the supported official dataset and display source/status/check dates separately.

  • No automatic permit mutation

    A lookup does not itself update a project's issued status or establish legal applicability.

Scope and availability: Gateway deployment and actual hardware onboarding are required. No production hardware calibration, anomaly control, general municipal feed, live CSLB/DIR connection or full operational digital twin is claimed.

Open the complete 731-entry source register (PDF) ↗
Platform: quality, safety and permits 11 entries

Record findings and route accountable follow-up through the project.

  • Inspections

    Capture supported inspection records and evidence.

  • Observations and deficiencies

    Describe issues, assign responsibility and track follow-up.

  • Punch items

    Maintain completion items and evidence-backed closure under the applicable authority.

  • Job walks

    Record field walks, observations, due dates, responsible parties and accountable finalization.

  • Formal closure rules

    Require the supported human determination; a party claim or AI recommendation cannot close an item on its own.

  • Safety observations

    Capture unsafe-condition reports and corrective actions.

  • Incidents and near misses

    Maintain incident/near-miss records and human recordability determinations.

  • Toolbox talks and training

    Record supported safety talks, training and participation evidence.

  • Permit screening

    Use country/jurisdiction-aware candidate screening with editable federal, state/province and local entries.

  • Applicability determinations

    Record a project-specific basis for permit applicability.

  • Issuance evidence

    Require supported clean evidence for issued status and preserve determination history.

Scope and availability: These workflows support accountable administration; they do not independently certify site safety, statutory compliance or permit applicability.

Open the complete 731-entry source register (PDF) ↗
New release: offline evidence capture and recovery 16 entries

Browser evidence capture has a separate identity and review chain from native draft synchronization.

  • Browser device-key enrollment

    Enroll a project-scoped capture key through authenticated controls before offline use.

  • Pinned server receipt key

    Verify returned receipts against the previously pinned signing identity.

  • Original-byte manifest

    Bind original files and observation metadata to a signed capture manifest.

  • Offline queue persistence

    Keep signed originals on the enrolled browser while disconnected, including tested browser restart scenarios.

  • Capture sequence tracking

    Maintain device-chain counters and avoid treating an older capture as new.

  • Reconnect receipt verification

    Clear eligible pending items only after validating the server receipt.

  • Dropped-response recovery

    Retry an uncertain capture with the same identity after a committed response is lost; avoid duplicate evidence.

  • Encrypted queue export

    Export a protected recovery backup using a user-held passphrase.

  • Revoked-device refusal

    Recheck device authority when reconnecting and retain refused originals for controlled recovery.

  • Recovery operator attribution

    Distinguish the original signer from the person recovering the backup.

  • Recovered-evidence quarantine

    Keep recovered originals unreviewed until the authorized inspection and review path completes.

  • Scanner prerequisite

    Require the configured scan/inspection result before recovered evidence can be accepted.

  • Independent reviewer separation

    Prevent original submitters and recovery operators from self-accepting the recovered evidence.

  • Original inspection and download

    Allow an authorized reviewer to inspect exact recovered bytes before recording a review.

  • Revocation preservation

    Recovery does not silently reactivate the revoked device.

  • Offline shell delivery

    Serve the cacheable capture shell and JavaScript modules with the required routing and MIME behavior.

Scope and availability: Physical iOS/Android acceptance and comprehensive offline drawings, RFIs, schedules and approvals are separate. A disconnected device learns revocation only after contact; local expiry remains important.

Open the complete 731-entry source register (PDF) ↗

Schedule & resources

TRACE Intelligence: schedule and resource scenarios 11 entries

Combine deterministic schedule analysis with bounded alternatives for authorized review.

  • Supported schedule imports

    Read CSV, XLSX, MS Project XML and Primavera P6 XER exports through supported parsers.

  • Immutable schedule versions

    Retain source identity, import assumptions and authorized version comparisons.

  • CPM and logic analysis

    Inspect supported critical-path calculations, relationships, gaps and version deltas.

  • Rolling look-ahead

    Prepare three-week look-ahead drafts with constraints, accountable transitions and export.

  • Living Project rehearsal

    Compare up to four user-supplied network alternatives for duration, release and dependency changes.

  • Recovery scenario generation

    Generate four fixed-priority heuristic proposals for eligible complete, unstarted networks of 1-200 activities and up to 1,000 supported relationships.

  • Work-calendar handling

    Evaluate supported work periods, closures and dependencies in the recovery planner.

  • Resource feasibility

    Respect declared labor/equipment capacities and material-release constraints in supported recovery cases.

  • Declared cost comparison

    Show direct work costs based on the supplied rates and inputs, rather than inferred project margin.

  • Unsupported-input refusal

    Inspect original source semantics; refuse unsupported logic, ambiguous defaults, actual-progress recovery and unrepresentable constraints.

  • Reviewable output

    Show assumptions, finish effects and relevant calculation evidence without modifying the imported schedule.

Scope and availability: Legacy rehearsal uses abstract elapsed minutes; recovery is a separate constrained planner. Neither guarantees a global optimum, constructability, Monte Carlo probabilities or automatic write-back to P6/MS Project.

Open the complete 731-entry source register (PDF) ↗
New release: archive, schedule and procedure detail 17 entries

Exportable review material and controlled improvement.

  • Registered archive coverage

    Include an explicit registry of supported project record families and flag coverage gaps.

  • Newer schema preservation

    Retain newer change-order fields and associated asset, sensor, visual-review, BIM-link and CAD-markup records.

  • Polymorphic target checks

    Verify that supported polymorphic evidence targets are represented rather than silently omitted.

  • Credential exclusion

    Exclude stored credential hashes and secrets from portable evidence packages.

  • Original file reconciliation

    Check selected file identities, bytes and hashes against the archive manifest.

  • Signed coverage manifest

    Release a complete marker only after record registry, file and coverage checks pass.

  • Independent archive verification

    Provide verifier resources for checking signatures and package consistency separately from the interactive portal.

  • External reference distinction

    Identify an external URL as a reference rather than implying its remote content is included in the archive.

  • Relationship-lag calendars

    Use the appropriate relationship and working-time basis in supported schedule rehearsal.

  • Progress methodology declaration

    Retain the selected progress/remaining-duration assumptions in the scenario packet.

  • Reviewable scenario signature

    Bind the signed rehearsal to its exact source, assumptions and result.

  • Full schedule packet printing

    Preserve complete row content across multiple printed pages in the tested packet path.

  • Reviewed outcome examples

    Build procedure candidates from expressly reviewed outcomes and their required evidence types.

  • Procedure evaluation

    Evaluate a proposed procedure against held-out examples and current source requirements.

  • Explicit procedure promotion

    Require authorized activation of a candidate rather than automatically changing live behavior.

  • Procedure retirement

    Retain history while stopping future use of a retired version.

  • Record-specific checklists

    Prepare unsent review steps for a selected authorized source record.

Scope and availability: A portable evidence archive is not a complete infrastructure backup. Procedure learning does not train foundation-model weights.

Open the complete 731-entry source register (PDF) ↗

Contracts & cost

Platform: commercial and contract controls 12 entries

Connect billing, cost and change records to their supporting evidence and authority.

  • Schedule of values

    Structure progress billing and maintain supported line allocations.

  • Payment applications

    Prepare progress applications with supporting records and review/payment clocks.

  • Certification controls

    Use supported content-bound, two-person certification and structural validation.

  • Compliance withholdings

    Track supported withholding amounts separately from the operation of the payment clock.

  • Change orders

    Keep approval and contract incorporation as distinct actions.

  • Contract growth

    Associate approved changes with SOV allocation while preserving the original contract value.

  • Cost codes and budgets

    Maintain budget, commitments, actual cost, forecast and variance records with attributable revisions.

  • Timesheets

    Record crew and equipment hours by cost code with supported approval.

  • Trade partners and subcontracts

    Maintain project partners and subcontract records.

  • Credential windows

    Evaluate entered license, registration, bond and insurance effective/expiry dates against the recorded work date.

  • Releases and waivers

    Manage configured release records and claimant exposure.

  • Stop payment notices

    Track notice-related withholding separately from release exposure.

Scope and availability: Legal and financial determinations require the controlling project terms and authorized review. Recorded credential windows are not a live licensing-board verification.

Open the complete 731-entry source register (PDF) ↗
Released contract evidence and reviewed procedures 6 entries

The tested package was deployed September 8, 2026 Pacific time. Existing workflow behavior and grants were preserved.

  • Transactional evidence decisions

    Connect supported formal record actions to explicit evidence acceptance, current source and authority checks, transaction locking and retry identity.

  • Contract provenance journal

    Maintain append-only, project-bound events, source relationships, configured evidence policy, cryptographic signatures and independent review.

  • Signed offline capture

    Enroll/revoke capture devices; sign local originals, pin receipt keys, retain offline queues, encrypt recovery backups, synchronize and quarantine recovered evidence for independent review.

  • Extended schedule semantics

    Use working-day and relationship-lag calendars, progress methodology, remaining durations and source-linked scenario packets.

  • Reviewed procedure lifecycle

    Record reviewed outcomes, evaluate candidate procedures, explicitly activate/retire versions and prepare unsent record-specific checklists.

  • Portable project evidence archive

    Export registered project records and eligible original files with credential exclusions, byte checks, signed coverage manifest and an independent verifier.

Scope and availability: Workspace is enabled. Mandatory new evidence gating on existing workflows is off; explicit evidence acceptances remain enforced. This release does not supply automatically approved jurisdiction rules or activate merchant billing.

Open the complete 731-entry source register (PDF) ↗
New release: contract decisions and evidence custody 20 entries

Detailed components of the released contract workspace.

  • Evidence source adapters

    Import authorized facts from RFIs, submittals, changes, payments, schedules, quantities, quality, meetings, labor, safety, procurement and reviewed passages.

  • Accountable organization selection

    Bind imported evidence to a configured project organization rather than accepting an invented party.

  • Evidence relationship graph

    Record supports, requires, contradicts, measures, implements, responds-to and derived-from relationships.

  • Audited source correction

    Retain the previous revision and correction reason rather than overwriting evidence history.

  • Evidence withdrawal controls

    Record withdrawal or control events while preserving historical references.

  • Live source freshness

    Recheck current source identity before proposals, relationships and accepted decisions.

  • Current actor refresh

    Refresh user and grant state without discarding the device-bound token context.

  • Decision intent binding

    Bind a proposed acceptance to its target, command content and source state.

  • Concurrent decision protection

    Serialize relevant decisions and source corrections with scoped locks and transaction checks.

  • Same-request receipt replay

    Return the prior result for an identical accepted request and reject reuse with changed content.

  • Stale browser action protection

    Detect changed account, project, form content or decision options during asynchronous lookups.

  • Existing approval continuity

    Keep ordinary approval behavior intact while mandatory evidence enforcement is disabled.

  • Explicit acceptance enforcement

    Validate an expressly supplied contract acceptance even in continuity mode.

  • Five extended terminal paths

    Support evidence acceptance at bid award, takeoff acceptance, accounting exchange approval, lien confirmation and stop-notice resolution.

  • Signed journal chain

    Bind ordered project events to previous hashes and a server signing identity.

  • Project calendar policy

    Configure timezone, working weekdays, exceptions and dated nonworking days.

  • Jurisdiction pack preview

    Preview versioned rule changes against source-linked project evidence before publication.

  • Jurisdiction version pinning

    Retain the exact reviewed pack, effective dates and publication history; do not silently inherit a changed rule set.

  • Evidence-aware permission display

    Show available controls from current capabilities while keeping restricted source facts out of the projection.

  • Immutable migration behavior

    Add journal/review structures while preserving existing records; destructive history rollback is refused.

Scope and availability: The deployed workspace does not automatically approve a source, issue a notice, send payment, adopt a legal rule or grant new access.

Open the complete 731-entry source register (PDF) ↗

Public works & compliance

Platform: labor compliance 11 entries

Support configured public-works and project-specific labor evidence workflows.

  • Compliance profile

    Configure the applicable project requirements and supported California public-works / PLA / CWA settings.

  • Requirement register

    Track required submissions and project-specific evidence.

  • Sealed submissions

    Receive attributable subcontractor compliance submissions.

  • DIR receipt evidence

    Record supported registration/receipt information for review.

  • Prevailing-wage review

    Compare reported classifications against supplied, cited rate determinations; flag unknown or missing classifications.

  • Apprenticeship notices

    Track DAS 140/142-related evidence and supported requests.

  • Apprenticeship ratios

    Review configured ratio information against submitted records.

  • Training funds

    Track supporting contribution evidence.

  • Assent and dispatch

    Maintain agreement/dispatch-related records where required by the configured profile.

  • Local and targeted hiring

    Track supported project workforce and hiring commitments.

  • Exception findings

    Use deterministic checks to identify gaps and document human resolution.

Scope and availability: No universal live wage-rate feed, autonomous trade classification or blanket legal-compliance guarantee is included. Time cards and certified-payroll review remain distinct processes.

Open the complete 731-entry source register (PDF) ↗

Preconstruction

Platform: preconstruction and estimating 12 entries

Prepare procurement and contractor estimates while preserving controlled access.

  • Preconstruction readiness

    Maintain supported readiness records and qualification information.

  • Procurement profiles

    Configure public or private operating workflows for the project.

  • Solicitations

    Prepare and manage supported solicitation records.

  • Addenda

    Track procurement amendments and associated documents.

  • Bidder access

    Use supported bidder invitation and controlled bid-room workflows.

  • Controlled bid receipt

    Receive and retain bid submissions through the configured process.

  • Human award

    Keep award decisions with authorized people.

  • Source-bound takeoff

    Associate supported quantity work with the source evidence used.

  • Deterministic estimating

    Build supported estimates with cost-code and cost-basis information.

  • Quotes and leveling

    Maintain supported internal quote and comparison information under contractor access controls.

  • Estimate handoff

    Move an authorized estimate through the supported controlled handoff process.

  • Contractor-private commercial data

    Do not expose internal estimates, quotes, budgets or leveling merely because an owner also uses TRACE.

Scope and availability: Procurement profiles are configurable workflows, not determinations that a bid, classification, protest or award is legally compliant.

Open the complete 731-entry source register (PDF) ↗

App Factory & inventory

Platform: App Factory and inventory 12 entries

Create supported custom trackers and manage attributable stock movements.

  • Natural-language app definition

    Describe a supported form or tracker and generate a reviewable constrained definition.

  • Typed fields

    Configure supported field types, validation and references.

  • Workflow states

    Define supported simple states and transitions.

  • Dashboard charts

    Add supported charts over application records.

  • Draft and revision review

    Inspect and edit the generated definition before publication.

  • Publication controls

    Use app-specific builder and publisher authority to release a supported revision.

  • My Apps runtime

    Open published applications and create or manage authorized records through the installed web runtime.

  • App-specific access

    Separate viewer, editor, builder and publisher grants.

  • Bounded recovery

    Restore an eligible prior valid published definition when required.

  • Inventory ledger

    Record receipts, transfers, issues and reversals with fixed-precision quantities and attribution.

  • Movement history and reconciliation

    Inspect stock movements and supported reconciliation records.

  • App-to-inventory references

    Link supported custom records to inventory items without automatically posting a stock movement.

Scope and availability: App Factory generates constrained definitions, not arbitrary executable programs. It does not automatically purchase material, post ERP transactions or connect external systems.

Open the complete 731-entry source register (PDF) ↗
Platform: advanced app and inventory tools 12 entries

Additional lifecycle functions behind the custom-application and stock-ledger workspaces.

  • App templates and catalogue

    Start from supported catalogue definitions or reusable templates.

  • Saved app drafts

    Retain editable drafts before publishing a valid application definition.

  • Blueprint import and export

    Exchange supported application definitions through validated blueprint workflows.

  • Definition migration preview

    Inspect supported schema/definition changes before applying an eligible migration.

  • Migration application

    Apply supported changes through the controlled application lifecycle.

  • Record operations

    Create, update and delete eligible custom-app records under app-specific permissions.

  • Search and pagination

    Find records in supported custom trackers without loading the entire record set at once.

  • Linked tracker references

    Relate supported records across authorized custom applications.

  • Summaries and dashboards

    Use supported record summaries, charts and dashboard layouts.

  • Manifests and health controls

    Inspect app definition/runtime state and use supported recovery-draft or repair operations.

  • Inventory setup

    Maintain item/location registers and opening-stock preview/application.

  • Stock balances

    Review balances and attributable movement history across authorized locations.

Scope and availability: These are validated application-data workflows. They do not establish arbitrary code execution, generalized ERP automation or fleet telemetry.

Open the complete 731-entry source register (PDF) ↗
App Factory: additional AI and customer controls 10 entries

Deployed web tooling with provider generation subject to current pricing, usage and service readiness.

  • Guided tracker creation

    Describe, review, save draft and publish through a four-step process.

  • Searchable tracker library

    Find trackers using library search and draft/published filters.

  • Stable field editing

    Add, remove and reorder typed fields without silently replacing stable field keys.

  • Interactive practice mode

    Preview a generated design and submit practice entries without creating business records.

  • Multiline records

    Preserve paragraphs and Unicode through preview, creation, editing and reload.

  • Contextual entry deletion

    Confirm deletion of the named selected entry with Keep entry as the safe default; this is not whole-tracker deletion.

  • Automatic training tracker

    Supported new-account paths receive one account-local SAMPLE inspection tracker with 15 fields, four transitions, a chart and a fictional record; existing accounts are not universally backfilled.

  • Idempotent sample provisioning

    Avoid duplicate samples and preserve user edits, deletions and revoked grants; eligible later members receive sample-specific access.

  • Known-definition recovery

    Recover eligible valid published definitions and repair derived indexes without inventing replacement business records.

  • Generation availability disclosure

    Earlier production generation passed, but later pricing/reconciled-usage gates blocked a tested request. Generation is implemented and conditional, not guaranteed available to every account.

Scope and availability: Client access follows the applicable browser and device requirements. Whole-tracker deletion and unrestricted executable generation remain separate from these supported tracker controls.

Open the complete 731-entry source register (PDF) ↗

Closeout & administration

Platform: closeout, integrations and governance 11 entries

Preserve the operating record and configure external exchange deliberately.

  • Closeout checklist

    Assemble evidence-backed turnover requirements and track completion.

  • Human closure acknowledgment

    Record accountable closure rather than inferring acceptance from an export.

  • Agency package builder

    Create supported record snapshots with a sealed manifest and content fingerprints.

  • Project archive

    Retain supported read-only archived records for authorized access.

  • Customer API

    Use supported scoped API operations with current authorization and read/write restrictions.

  • Integration configuration

    Maintain supported provider setup, mapping and connection-health information; unavailable adapters remain unavailable.

  • Source and record export

    Export supported records, manifests, proof reports and exchange formats.

  • Tenant/project separation

    Enforce server-side scope and effective permissions across governed endpoints.

  • Attributable history

    Retain supported audit events, sealed content identity and linked corrections.

  • Platform administration

    Manage supported account/module licensing, grants, AI usage and operational settings.

  • Support and onboarding

    Use product help and supported support workflows; configure email, retention, backup and external connections for the deployment.

Scope and availability: Named integration catalog entries are not proof of active adapters. SSO/MFA/SCIM, enterprise certifications, failover and restore guarantees require separately verified delivery terms.

Open the complete 731-entry source register (PDF) ↗
Commercial onboarding availability 3 entries

Separate billing technology from the construction capability inventory.

  • Subscription onboarding controls

    Corrected provisioning checks distinguish subscription activation from verified completed payment and enforce plan mismatch guards.

  • Atomic account provisioning

    Implemented receipt/account/encrypted-mail enqueue and retry controls are documented.

  • Sandbox checkout development

    Sandbox OAuth, catalog and checkout creation are recorded; end-to-end buyer approval, webhook activation, delivery and live launch acceptance remain incomplete.

Scope and availability: Paid self-service launch is not accepted merely because sandbox objects or subscription routes exist. Quote-based public pricing and actual provider readiness remain relevant.

Open the complete 731-entry source register (PDF) ↗
Windows, Mac, iOS and Android access 4 entries

Browser access, released native-server contracts and continuing installed-client development are distinct delivery paths.

  • Desktop access

    Windows and Mac can use supported browser workflows. A Windows application with a separate protected native draft workspace and isolated online portal window is undergoing installed acceptance.

  • Mobile access

    iOS and Android have native-client development, shared interface and bridge work. Signed distribution and physical-device acceptance must be confirmed for the applicable release; supported browser access remains separate.

  • Device permissions

    Microphone, camera, file selection, downloads and notifications follow the device/browser permission settings.

  • Graphics and connectivity

    Interactive CAD/BIM requires compatible graphics support; provider-backed and connected workflows require the relevant network/service connection.

Scope and availability: Device project enumeration and signed draft synchronization APIs are released. This does not establish App Store/Play distribution, complete native parity or offline formal approvals.

Open the complete 731-entry source register (PDF) ↗

Development & release limits

TRACE telephone voice development 5 entries

Updated by the September 9 AI/operations release: interruption handling corrected and a user-reported real-call acceptance passed.

  • Telephone conversation gateway

    Configured telephony gateway connects caller audio with a realtime AI conversation service.

  • Public product knowledge

    Provide TRACE product/help knowledge through the configured voice service; this does not establish unrestricted project-document access over telephone.

  • Turn and response controls

    Manage conversation-turn behavior and response-length settings to reduce interrupted or unfinished speech.

  • Privacy-safe timing diagnostics

    Collect timing/completion telemetry for audio-gap diagnosis without recording audio or transcript text in that diagnostic.

  • Versioned gateway deployment

    The current operations/help gateway passed 37 voice tests and TypeScript checks. Its audio/queue code matches the real-call-tested version.

Scope and availability: The earlier interruption issue is superseded by the documented fix and user-reported natural, responsive real-call result. Device, network and conversation conditions still affect call quality.

Open the complete 731-entry source register (PDF) ↗
Advanced capability architecture and extensions 12 entries

Development history remains visible. Later production receipts supersede earlier candidate-only descriptions.

  • Universal approval evidence gates

    Released for the supported bid-award, takeoff, accounting-exchange, lien-release and stop-notice paths. Explicit submitted acceptances are validated; mandatory gating of existing workflows remains disabled.

  • Expanded contract and procedure controls

    Released customer device recovery/revocation, reviewed-procedure activation/drafting/retirement and jurisdiction-pack validation. Project policy and legal-rule content still require authorized configuration.

  • Approved jurisdiction packs

    Validation machinery does not supply approved legal rule content; authoritative pack review remains outstanding.

  • Richer direct-face DXF path

    Direct POINT/LINE/3DFACE extraction, restricted parsing, listener recovery, Documents opening and printing passed isolated staging acceptance. This successor is distinct from the production DWG viewer.

  • Broader regional recovery

    Current isolated authentication, encrypted capture/restore, scoped regional-independence and backup recurrence evidence exists; full current-region production promotion/routing/write survival/failback remains unaccepted.

  • Native Revit and federation

    Licensed native translation, multi-model federation and cross-source coordinate reconciliation remain advanced integration work.

  • 4D and 5D intelligence

    Model-linked schedule playback, cost exposure, trade/zone capacity and richer package/procurement readiness remain roadmap scope beyond bounded delivered tools.

  • Calibrated predictive models

    Trained, prospectively validated delay/cost probabilities require suitable outcome data and validation; workload scenarios are not those probabilities.

  • Autonomous reality capture

    Continuous drone feeds, photo-to-3D reconstruction, calibrated field-to-plan deviation measurements and certified visual takeoff remain unestablished.

  • Full operational digital twin

    Automatic asset/BIM identity mapping, sensor-based physical-state simulation and municipal lifecycle synchronization remain incomplete.

  • General regulator synchronization

    Live CSLB/DIR/wage and broad jurisdiction feeds remain separate from the limited delivered permit adapter.

  • Unrestricted self-learning and repair

    Autonomous model-weight training, arbitrary executable self-modification and universal automatic infrastructure repair are not delivered capabilities.

Scope and availability: Some staging/candidate areas continue to change. Only a scoped acceptance/deployment receipt can promote their availability status.

Open the complete 731-entry source register (PDF) ↗
Native client development and released server contracts 30 entries

Detailed platform-specific work remains visible without confusing source code, tests and public distribution.

  • Restricted native login contract

    Issue enrollment/sync credentials through dedicated client routes rather than a generic unrestricted API bridge.

  • Device-bound token authority

    Tie synchronization authority to the selected enrolled device and current owner.

  • Native project directory

    Return only projects individually authorized for the current tenant, user, device, organization, membership and client surface.

  • Minimal project identity envelope

    Return schema version, tenant/user/device identity and minimal project ID, name, number and lifecycle fields.

  • Bounded directory pagination

    Scan a bounded page and continue by cursor, including empty visible pages with more candidates remaining.

  • Private directory responses

    Use no-store responses and a request-rate limit for the installed-client project selector.

  • Full-envelope native replay check

    Compare canonical payload, signature, proof version, record identity, operation type, version, logical clock, counter and normalized wall-clock before replaying a receipt.

  • Altered retry rejection

    Return conflict for an operation UUID reused with changed content instead of presenting an earlier accepted receipt.

  • Monotonic batch high-water mark

    A refused lower counter cannot lower the threshold for subsequent items in the same batch.

  • Stable refused receipts

    An exact retry of a refused operation retains its prior disposition; it does not become accepted.

  • Protected native draft storage

    Windows durable counters and OS-protected draft queues are in active implementation and acceptance.

  • Isolated online portal window

    Windows development embeds the existing online portal in a sandboxed window with normal web login and CSRF, separate from privileged native storage.

  • Online workflow reuse

    RFI, submittal, timecard and approval workflows use their existing portal authority instead of bypassing it through device tokens.

  • Controlled child views

    Desktop development covers document popups, same-origin blob previews, printing and user-visible downloads without exposing a privileged bridge.

  • Identity-change cleanup

    Desktop acceptance checks account cancellation, logout and separate browser-session cleanup.

  • Cached snapshot limitation

    A snapshot checksum is not a detached server-signed grant. Cached permissions support bounded offline UX, not fresh server authority.

  • Reconnect authorization

    Server checks current device, membership, project, organization, field policy and signatures before accepting drafts.

  • Consequential command refusal

    Formal offline commands remain refused; a draft receipt does not approve, issue or pay a record.

  • Cross-platform material workflow

    Windows/iOS/Android candidate work includes draft, submit, return, approve, order and receive stages with named approvers.

  • Authorized approver picker

    Candidate material workflow resolves eligible people by project authority instead of relying on a typed internal identifier.

  • Voice-to-material draft protection

    Candidate validation prevents voice-created line items from injecting approval fields.

  • Shared mobile bridge and UI

    Android and iOS source integration and shared generated interface assets are being reconciled and tested.

  • Android build verification

    The development task records a successful native compile; broader tests and signed distribution remain separate.

  • Installed reviewer acceptance

    Synthetic desktop login/read/CSRF/logout checks passed; installed reviewer, offline queue and full release acceptance remain open at this checkpoint.

  • Protected original-operation queue

    New native source work preserves the original signed operation in a protected queue rather than regenerating it on every retry.

  • Deterministic enrolled Ed25519 signing

    Native source work signs the enrolled-device envelope deterministically; focused tests verify the signing contract.

  • Immutable signed-envelope readback

    Native queue components read back the retained envelope and detect changed stored content.

  • Validated immutable native receipts

    Native source components validate and retain immutable receipt results for the submitted operation.

  • Exact native upload transport

    New orchestration targets the dedicated operations contract with account/device identity checks; current orchestration tests use mocked transport.

  • Native integration boundary

    The new queue/orchestration is not yet integrated into the main/renderer release or accepted against the live server; no newer signed executable acceptance is recorded.

Scope and availability: Server project-directory and replay fixes are released. The Windows and mobile application components listed as development require their own signed-build, installed and physical-device acceptance.

Open the complete 731-entry source register (PDF) ↗
Self-healing: bounded diagnosis and recovery 19 entries

Named recovery mechanisms exist; later staging registrations do not imply blanket production activation.

  • Structured database diagnosis

    Classify transaction conflicts, contention, timeouts, interruptions, access failures, constraints, schema/query errors and cancellation using driver codes.

  • Sanitized diagnostics

    Avoid exposing SQL text, bindings, credentials or customer payloads in recovery guidance.

  • Allowlisted read recovery

    Retry only explicitly supported factory and inventory reads, rather than arbitrary application calls.

  • Three-attempt retry budget

    Bound eligible transient read recovery to at most three attempts.

  • SQLite contention handling

    Recognize BUSY/LOCKED failures within the eligible retry policy.

  • PostgreSQL contention handling

    Recognize selected lock-unavailable and transient read failures without retrying permanent errors.

  • Per-attempt authorization refresh

    Recheck user, tenant, administrator and reference authority before retrying and returning data.

  • Pinned initiating identity

    Prevent a retry from following a later account or tenant switch into another scope.

  • Circuit cooldown

    After exhausted transient work, retain a bounded cooldown rather than retry indefinitely.

  • Private retry guidance

    Return private 503 responses with a retry indication and a fixed reason code for eligible failures.

  • Uncertain-write reporting

    Report an unconfirmed write outcome without claiming either success or loss.

  • No blind write replay

    Reconcile uncertain mutations by their durable receipt/idempotency identity instead of automatically repeating them.

  • Statement deadlines

    Apply transaction-local PostgreSQL statement deadlines to supported reads.

  • Lock deadlines

    Apply transaction-local lock deadlines while preserving stricter deployment limits.

  • Caller transaction protection

    Do not interfere with caller-owned transactions or leak timeout settings beyond commit/rollback.

  • Telemetry isolation

    A telemetry failure must not transform a completed operation into a replayable failure.

  • Batch fault isolation

    One failing application does not prevent another eligible application's inspection or recovery.

  • Truthful batch exit status

    Report failed, degraded and deferred work rather than labeling a partly failed sweep successful.

  • Cancellation respect

    Do not retry explicit cancellation or permanent permission/schema failures.

Scope and availability: Self-healing means bounded handling of named failures. It is not an error-free guarantee, arbitrary query rewriting, unrestricted code repair or zero-downtime certification.

Open the complete 731-entry source register (PDF) ↗
Self-healing: application generation and derived state 16 entries

Controlled repair preserves business records and publication authority.

  • Scheduled application health sweep

    Inspect a bounded set of app definitions and runtime state with overlap and lease guards.

  • Known-good definition restoration

    Restore an eligible prior valid published definition while preserving recorded business data.

  • Row-locked definition repair

    Own one scoped transaction during repair and retain tenant ownership.

  • Derived-index health checks

    Detect eligible missing or inconsistent derived indexes separately from original records.

  • Bounded index repair

    Repair supported derived indexes within configured scan/repair budgets.

  • Ordinary timer index acceptance

    Saved staging evidence includes timer-driven repair; configuration alone is not counted as that scenario test.

  • Stale generation recovery

    Inspect eligible abandoned generation work through a separately enabled recovery schedule.

  • Invalid-schema correction attempt

    For eligible completed invalid provider output, make at most one guarded correction request.

  • Correction authorization guard

    Refresh builder permissions, app version, references and catalog before a second provider attempt.

  • Separate correction accounting

    Reserve quota and settle usage separately for each attempt, linking the correction to the original.

  • Shared provider deadline

    Use only the remaining original deadline; do not start a correction when insufficient time remains.

  • No automatic publication from repair

    A corrected schema remains subject to validation, review and explicit publication.

  • Unsupported integration refusal

    Do not retry unsupported external integrations, unavailable references or unknown connection outcomes as automatic schema fixes.

  • Incremental app generation

    Retain constrained definition/version semantics when generating an eligible application change.

  • Lease-aware progress

    Check ownership before doing sweep work or advancing its cursor.

  • Admission-contention recovery

    Later staging evidence records bounded admission contention retry; this does not prove recovery of every API or worker failure.

Scope and availability: Core factory tooling has an earlier production release. Newer repair switches and exact acceptance belong to their recorded staging revisions; generation correction is independently gated.

Open the complete 731-entry source register (PDF) ↗
Self-healing: uploads, documents and worker delivery 21 entries

Durable admission and recovery workflows protect source identity.

  • Upload admission transitions

    Track accepted upload intent separately from its final target receipt.

  • Private upload recovery snapshots

    Retain bounded private source snapshots for eligible finalization recovery.

  • Quarantine recovery

    Inspect eligible quarantined upload work without treating unsafe content as clean.

  • Real scanner integration tests

    Recorded isolated recovery acceptance includes actual scanner execution and refusal paths.

  • Queued finalization recovery

    Recover eligible interrupted upload finalization through a scoped handler and durable identity.

  • Atomic target receipt linkage

    Link a finalized target to the corresponding upload operation rather than inventing a second result.

  • Permission-aware queued reprocessing

    Revalidate source ownership and current processing authority before delayed work.

  • Knowledge extraction recovery

    Maintain named recovery handling for eligible extraction intents and source/version identities.

  • Page-batch preservation

    Acceptance criteria protect already committed page/passage hashes during recovery.

  • Ordinary extraction timer gap

    Current registration is evidenced; the latest owned interrupted-admission timer scenario remains a separate unfinished acceptance.

  • BIM admission outbox

    Record initial BIM-source admission with tenant/project/version/hash/storage identity and original uploader.

  • Fenced delivery claim

    Use a time-bounded delivery claim before inserting the admitted extraction job.

  • Transactional queue insertion

    For supported database queues, insert the job and sent receipt in the same transaction.

  • Transport-specific refusal

    Unsupported queue transports remain pending; no nontransactional fallback is presented as equivalent.

  • Delivery attempt budget

    Bound admission attempts, cooldown, lifetime and sweep size.

  • Duplicate-admission protection

    Repeated admission cannot reset the original work budget.

  • Extraction/publication distinction

    Delivery of an extraction job does not mean extraction, human review or model publication succeeded.

  • Private snapshot cleanup

    Bound deletion and scanning of eligible expired recovery snapshots.

  • Scheduler overlap guards

    Prevent overlapping eligible health, generation, index, quarantine, extraction, finalization and cleanup runs.

  • Separate manual retry

    Keep explicit manual BIM retry separate from initial admission-delivery recovery.

  • Partial PDF recovery acceptance

    A newer isolated real-Laravel test preserves committed page 1 and completes page 2 after a deliberately injected fault. The deployed ordinary-timer continuation remains a distinct acceptance.

Scope and availability: Later staging has enabled recovery registrations. Handler tests, timer observations and full workflow recovery are different evidence levels; not every promised failure has an accepted timer scenario.

Open the complete 731-entry source register (PDF) ↗
Self-healing: runtime, backup and regional recovery 26 entries

Infrastructure developments are listed individually with their current acceptance limits.

  • Immutable release identity

    Bind prepared runtime files and configuration to reviewed release manifests.

  • Baseline drift refusal

    Stop a deployment when current production files differ from the approved baseline.

  • Shared deployment lock

    Serialize cooperating releases instead of overwriting simultaneous work.

  • Pre-release backups

    Preserve affected runtime files, configuration and database snapshots before accepted releases.

  • Private database backup verification

    Validate retained backup archive structure with the matching database tool version.

  • Source-hash parity

    Compare deployed bytes with reviewed/tested candidate hashes.

  • Controlled service reload

    Reload application services and gracefully restart queue workers after the release switch.

  • Known-state rollback

    Restore backed-up runtime/configuration while preserving newly recorded evidence and signing identity.

  • Immutable activation receipts

    Record exact staging release, configuration and runtime-acceptance identities.

  • Interrupted publication recovery

    Candidate supervisor work records durable intent and permits recovery only from recognized partial publication states.

  • Unknown-state refusal

    Refuse another exchange or blind rollback when release ownership or pending-state identity is uncertain.

  • Service startup checks

    Verify web, worker and scheduler service behavior before opening the accepted staging endpoint.

  • Boot-persistence checks

    Inspect startup enablement and bounded retry requirements after reboot; full current regional acceptance remains separate.

  • Encrypted checkpoint capture

    Create encrypted snapshots with independently verified ciphertext identity.

  • Cross-host retained copies

    Verify matching retained encrypted bytes and receipts on two hosts for accepted staging captures.

  • Interrupted transfer reconciliation

    Resume transfer of the exact existing ciphertext without silently recapturing a new snapshot under the old identity.

  • Scheduled backup recurrence

    A later ordinary staging timer capture completed unattended with matching two-host evidence.

  • Plaintext cleanup verification

    Check removal of owned temporary plaintext and work artifacts after retained capture.

  • Revision hold for backup changes

    Pause eligible backup work during a staged revision until its own acceptance completes.

  • Restoration rehearsal

    Recorded isolated restores reconcile selected database rows and file objects; coverage gaps remain explicit.

  • Region promotion preparation

    Prepare/fence source and destination runtime identities before a proposed failover.

  • HTTPS and DNS acceptance

    Require runtime, private HTTPS, routing and post-route checks rather than treating promotion alone as successful failover.

  • Post-route write survival

    Regional acceptance requires scoped writes/files to survive the routed runtime and later reconciliation.

  • Failback verification

    Returning to the original region requires its own acceptance and permission/state reconciliation.

  • Restored-document authorization

    A remaining specific test must verify an existing restored document's actual authorized download, version/hash and denied-access behavior.

  • Provider security dependency tracking

    Retain unresolved provider storage/security questions as dependencies rather than claiming external certification.

Scope and availability: Production release safeguards are in use. The broader regional program is isolated staging work; complete automatic regional failover, continuous backup guarantees and universal self-repair are not established.

Open the complete 731-entry source register (PDF) ↗
Advanced BIM, predictive risk and invention concepts 22 entries

All previously discussed advanced concepts remain visible; a concept is not a shipped feature.

  • Design-package readiness

    Propose versioned deliverable/prerequisite views by discipline or zone, without treating incomplete evidence as permission to build.

  • Confirmed change impact map

    Extend confirmed model/record links into review impact across requirements, activities and cost allocations.

  • Procurement exposure map

    Relate declared lead times and required-on-site dates to selected package/installation assumptions.

  • Model federation

    Combine models only after explicit units, coordinate and reference alignment acceptance.

  • 4D schedule playback

    Propose model state playback bound to explicitly mapped schedule versions and activity dates.

  • 5D cost exposure

    Propose allocated cost links with protection against counting the same cost line repeatedly.

  • Licensed Revit translation

    Evaluate authorized RVT translation separately from native Revit authoring or automation.

  • Information Delivery Specification checks

    Evaluate machine-readable model information requirements against a supported model/toolchain.

  • Model-to-BCF action drafts

    Prepare traceable issue/RFI drafts from accepted coordination findings for human adoption.

  • Prospective risk outcomes

    Capture what was known at forecast time and prevent later outcomes or revisions leaking into training features.

  • Calibrated risk probabilities

    Require chronological holdout comparison, calibration and uncertainty before advertising delay/cost probabilities.

  • Trade and zone capacity

    Model declared resource demand, access and temporary-work occupancy for supported scenarios.

  • Weather-sensitive work exposure

    Use dated forecasts and explicitly approved thresholds for advisory activity exposure.

  • Design-build interface responsibility

    Record named organizations, delegated design and scope boundaries with source-backed authority.

  • Commissioning and turnover map

    Propose versioned associations among equipment, tests, O&M requirements and asset records.

  • Evidence Readiness Map

    Prototype a 3D view of missing release evidence and prerequisites rather than inferred physical defects.

  • Decision Replay

    Reconstruct the evidence available when a decision was recorded while keeping later information separate.

  • Minimum-Unblock Plan

    Propose a bounded set of documented review/procurement steps that clears declared prerequisites, with conditional effects.

  • Continuous field-to-plan capture

    Future calibrated image/drone pipelines need source registration, physical scale, temporal alignment and validation.

  • Municipal living asset twin

    Future live simulation and municipal handover require real asset identity, sensor connections and maintenance data contracts.

  • Broad regulator synchronization

    Future CSLB, wage and permit feeds need authorized providers, current jurisdictions and source validation beyond the limited existing adapter.

  • Autonomous code repair boundary

    Arbitrary generated code, automatic hotfix deployment and foundation-model self-training are not implemented by bounded recovery.

Scope and availability: These are engineering directions and product concepts, not patent novelty, competitor superiority or an error-free guarantee.

Open the complete 731-entry source register (PDF) ↗
Reliability: customer-facing claims and measured limits 10 entries

How to describe the system accurately while retaining every reliability development.

  • Self-healing claim

    TRACE contains bounded, permission-aware recovery mechanisms for named failures; each requires its recorded configuration and acceptance.

  • Error-free claim boundary

    No finite test suite establishes an error-free system. Public wording should name verified safeguards and observed results.

  • No test-count inflation

    Overlapping suites, inherited tests and different frozen releases are not added into a universal coverage percentage.

  • Source-scoped answer quality

    An accepted cited answer or adversarial fixture is evidence for that case, not universal answer accuracy.

  • No inevitable intelligence growth

    Scheduled failure capture and reviewed evaluation enable improvement work; next year is not automatically smarter without validated changes.

  • Fail-closed consequential actions

    Missing authority, evidence, stale sources, unsupported inputs or uncertain outcomes result in refusal or review rather than invented success.

  • Production versus staging distinction

    A registered timer, built binary, private prototype or successful isolated test is not a production release receipt.

  • Real versus synthetic distinction

    Demonstration records, generated fixtures and prepared stock movements remain labeled as synthetic.

  • Configuration dependency disclosure

    Provider accounts, merchant credentials, legal rule adoption and per-user grants control availability.

  • Independent decision authority

    Human engineering, legal, safety, payment and project approvals remain attributable to authorized people.

Scope and availability: This inventory documents capabilities and developments; it is not an independent certification or a new full-system test.

Open the complete 731-entry source register (PDF) ↗

Current platform license options

Platform modules and access options 34 options

Choose the modules your team needs. Availability, project permissions and licensed scope apply.

  • TRACE help & training

    TRACE answering questions about TRACE Management System itself: how to use each screen, what a capability does, and the basics of public-works administration. Reads the TRACE product knowledge base only - never your project evidence - and cannot draft contract documents.

    Available · Included account tool
  • Account & profile

    Profile, password, company logo, sign-in security.

    Available · Included account tool
  • Projects

    Create and open the projects inside your own account.

    Available · Included account tool
  • TRACE project assistance

    TRACE - Traceable Record-Anchored Cited Evidence. Cited answers grounded in THIS project's own authorised records, plus drafting and preparation help for RFIs, submittals and notices. TRACE cites or refuses; it never decides, and every formal action still requires an accountable human.

    Available · License required
  • Submittals

    Submittal register, spec-section routing, review clocks and stamping.

    Available · License required
  • RFIs

    RFI register, ball-in-court clocks and sealed responses.

    Available · License required
  • Daily reports

    Field daily reports with sealed signatures; corrections append.

    Available · License required
  • Daily Project Success Brief

    A daily position statement assembled deterministically from this project's own sealed records and contract clocks. Every line carries its citations, its epistemic type, its freshness and a derived confidence, and anything the system cannot know is printed as an explicit refusal. No language model writes any part of it.

    Available · License required
  • Branded RFI & submittal documents

    Issue-ready RFI and submittal transmittals composed from the record itself and branded to YOUR account and your counterparty - never to TRACE Management System. Parties, precedence of contract instruments, contract clock and sealed attachment hashes are derived, not typed.

    Available · License required
  • Schedule intelligence

    Immutable schedule versions, deterministic CPM checks and an authorisation-filtered delta ledger.

    Available · License required
  • Project documents

    Ingest born-digital files, scanned PDFs and direct drawing/receipt images as tenant-scoped evidence. OCR text, page identity, extraction method and confidence remain attached to every retrievable passage; low-quality visual evidence requires human confirmation.

    Available · License required
  • Photos & media

    Media upload with SHA-256 provenance sealing.

    Available · License required
  • Weather intelligence

    Live forecast bound to project coordinates, with cited weather notices.

    Available · License required
  • TRACE Field applications

    Commercial product ceiling for TRACE Field on mobile and approved field devices. Platform sales controls the product licence; the City then narrows the enabled project features, each organization, and each person. Device operating-system permissions and Meta preview enrollment remain separate gates.

    Available · License required
  • Look-ahead schedule

    Three-week rolling look-ahead drafts, constraint tracking, accountable transitions, and project export.

    Available · License required
  • Inspections & punch

    Inspection, observation, deficiency and punch capture. Closure requires an accountable formal determination - a party claim or an AI recommendation cannot close an item - and every status change appends a hash-chained event.

    Available · License required
  • Permits & agency approvals

    Country- and jurisdiction-aware permit screening with editable federal, state/province and local candidates. Applicability requires an accountable project-specific basis; issued status requires clean evidence, and every determination remains in a hash-chained history.

    Available · License required
  • Change orders

    Change orders with approval and incorporation kept as two separate acts, allocation to the schedule of values, and a contract-growth bridge that never touches the original contract value.

    Available · License required
  • Preconstruction & procurement

    Governed preconstruction readiness, qualification, solicitation, addenda, controlled bid receipt and human award workflows. Public and private procurement profiles are configurable operating postures, not legal-compliance determinations.

    Available · License required
  • Estimating & takeoff

    Contractor-facing source-bound takeoff, deterministic estimating, cost-code basis and controlled estimate handoff. Internal estimates, quotes, budgets and leveling details are not exposed to an owner merely because the owner uses TRACE.

    Available · License required
  • Payment applications

    Progress billing on a schedule of values, with server-authoritative refusal of structurally improper requests, two-person certification bound to a content hash, and compliance withholdings that reduce the amount without stopping the payment clock.

    Available · License required
  • Releases & stop notices

    Waivers and releases under Civil Code ss. 8132-8138 and public-works stop payment notices under ss. 9300-9364. Reported as two totals that are never netted against each other: a release reduces exposure to a claimant, a notice freezes money still owed to the contractor.

    Available · License required
  • Trade partners & credentials

    Project trade partners and subcontracts with attributable licence, DIR, bond and insurance windows evaluated for the day the work occurred.

    Available · License required
  • Labor compliance

    Configurable California public-works and project-specific PLA/CWA requirements; sealed subcontractor submissions; DIR receipt, prevailing-wage, DAS 140/142, apprenticeship-ratio, training-fund, assent, dispatch, local/targeted-hire and workforce tracking; deterministic exception review with human resolution.

    Available · License required
  • Meetings

    Project meetings with agenda, content-hashed minutes, action items, and accountable finalization.

    Available · License required
  • Transmittals

    Append-only issued-document register for branded RFI, submittal, change-order, and pay-application cover transmittals.

    Available · License required
  • Job walk

    Project-scoped field walks, content-hashed observations, responsible parties, due dates, evidence-backed closure, and accountable finalization.

    Available · License required
  • Plans coordination

    Native API-backed plan sets, project-document sheet proposals, human-attested bulk registration, safe preview, immutable revisions, formal review, internal markups, and OCR of scanned notes, legends and sheet references with page/region provenance. Project-specific precedence is a separate named human determination. TRACE may read cited extracted evidence; geometry, scale, dimensions, linework and design intent require supported visual analysis or human confirmation and are never inferred from OCR alone.

    Available · License required
  • BIM coordination

    Governed IFC ingestion with immutable source hashing, isolated object/property extraction, a human publication gate, an internal reviewed-geometry viewer, searchable model objects, explicit revision-bound evidence links to authorized RFIs/submittals/schedule activities, extracted-property revision comparison, bounded single-model IFC intersection and clearance candidates, and BCF 2.1 issue exchange. Native Revit ingestion, model federation, geometric revision comparison, design certification, and permission-to-build decisions are not claimed.

    Available · License required
  • Safety & observations

    Observations, incidents, near misses, toolbox talks, training and corrective actions with human recordability determinations and hash-chained transitions.

    Available · License required
  • Budget & costs

    Project cost-code register for budget, commitments, actual cost, forecast and variance with attributable, hash-chained revisions.

    Available · License required
  • Timesheets

    Crew and equipment hours by cost code.

    Available · License required
  • Closeout

    Evidence-backed turnover checklist, human closure acknowledgment, and read-only project archive.

    Available · License required
  • Send to City

    Agency package builder using governed record snapshots, a sealed manifest and SHA-256 fingerprints. Export never falsely claims agency submission, receipt, or acceptance.

    Available · License required

Package inclusion is confirmed in your quote. Connected services and device permissions may require separate setup.